User Manual

37
Twin Otter ARF Assembly Manual
Nose Cone Installation
Parts Required
Fuselage Nose cone
#4 x 7/16-inch woodscrews (3)
Tools Required
#1 Phillips screwdriver Ruler
􀀀 Step 1
Use a #1 Phillips screwdriver to install a #4 x 7/16-
inch woodscrew in each of the two holes in the top of
the nose bulkhead. Install them so that the head of the
screw is 1/8 inch from the face of the bulkhead.
􀀀 Step 2
Slide the nose cone into place over the screws then
turn it counterclockwise to engage the screw heads in
the keyhole slots in the nose cone bulkhead.
􀀀 Step 3
Use a #1 Phillips screwdriver to install a #4 x 7/16-
inch woodscrew in the lower left side of the cowling to
retain it on the fuselage.
Receiver, Battery and Switch
Installation
Parts Required
Fuselage Receiver
Battery Switch
Y-harness (3) 9-inch extensions leads (2)
36-inch extension leads (2)
Tools Required
Pin vise Double-sided foam tape
1/16-inch drill bit #1 Phillips screwdriver
􀀀 Step 1
Mount the switch in your preferred location. It is shown here
on the lower fuselage ahead of the main landing gear.