User's Manual

D101583 0207 BL ident 3
Safety Instructions!
Before beginning installation work
Disconnect the device from the power supply
Ensure against accidental restart
Verify isolation from the supply
Cover or close off neighbouring units that are live.
The assembly instructions provided for the device are to be
complied with
Only suitably qualified personnel according to EN 50 110-1/-2
(VDE 0105 part 100) are authorised to carry out work on this
device/system.
When conducting installation work ensure that you are free of
electrostatic charge before touching the device.
Connection and signal cables are to be installed so that any
inductive or capacitive interference does not impair the
automation functions.
The installation of automation devices and their operating
elements is to be carried out in such a way as to prevent
unintentional operation.
In order to prevent cable or wire breakage on the signal side
generating undefined states in the automation devices,
appropriate safety measures are to be taken for the I/O coupling
on the hardware and software side.
The functional earth (FE) must be connected to the protective
earth (PE) or the equipotential bonding. The system installer is
responsible for establishing this connection.
Ensure a reliable isolation of the extra-low voltage for the 24 volt
supply. Only those power supply units that comply with IEC 60
364-4-41, i.e. HD 384.4.41 S2 (VDE 0100 part 410) are to be
deployed.
Fluctuations or deviations of the mains voltage from the nominal
value should not exceed the tolerance limits specified in the
technical data, otherwise malfunctions and dangerous states
may occur.