Installation Guide

8
English
Open the stops (1).
Install the carrier plate so that the notch is at the
bottom (2).
Install the carrier plate screws.
Push the thermostatic mixer sleeve on so that the
indexing mark is at the 9:00 position.
Push the volume control sleeve on.
Install the escutcheon.
Place a dab of waterproof sealant at each grout
joint.
1.
2.