INSTALLATION AND OPERATION MANUAL Q.PEAK DUO ML-G9.
TABLE OF CONTENTS 1 2 3 4 5 6 7 6 INTRODUCTION PLANNING 2.1 TECHNICAL SPECIFICATIONS 2.2 REQUIREMENTS 2.3 MOUNTING OPTIONS 2.4 ELECTRICAL LAYOUT INSTALLATION 3.1 SAFETY AND TRANSPORT 3.2 PREPARATION OF INSTALLATION 3.3 MODULE INSTALLATION ELECTRICAL CONNECTION 4.1 SAFETY 4.2 ELECTRICAL INSTALLATION SAFETY 4.3 CONNECTION OF MODULES 4.
1 INTRODUCTION Validity 2 PLANNING 2.1 TECHNICAL SPECIFICATIONS For additional information see the relevant datasheet of the module provided at www.q-cells.us. These instructions are only valid for crystalline solar modules from the company Q CELLS as specified at chapter „2.1 Technical Specifications“. Q CELLS assumes no liability for damage resulting from failure to observe these instructions. Ä Please observe the wiring and dimensioning of the system.
2 PLANNING 2.2 REQUIREMENTS Installation Site Please note the following guidelines that apply to the installation site: • Solar modules are not explosion-proof and are not suitable for use in explosive environments. Ä Do not operate solar modules near highly flammable gas and vapors (e.g. gas tanks, gas stations). Ä Do not install modules in enclosed space. Ä Do not install modules in locations where they may be submerged in water (e.g. floodplains).
2 PLANNING 2.3 MOUNTING OPTIONS 2 PLANNING 2.3 MOUNTING OPTIONS Specifications MODULE TYPE Q.PEAK DUO ML-G9 Q.PEAK DUO ML-G9+ Q.PEAK DUO BLK ML-G9 Q.PEAK DUO BLK ML-G9+ TEST LOAD PUSH/PULL** [PA] DESIGN LOAD PUSH/PULL** [PA] 5400 / 4000 3600 / 2660 14.8 (376) 3300 / 4000 2200 / 2660 IP1 - 3300 / 3300 2200 / 2200 CL1a 0.79 - 21.7 (20 - 550) 2400 / 2400 1600 / 1600 CL1b 0.79 - 21.7 (20 - 550) CL3 9.84 - 17.7 (250 - 450) 3300 / 4000 2200 / 2660 CL5 short side: 3.94 - 9.
2 PLANNING 2.4 ELECTRICAL LAYOUT Module Selection For detailed key electrical data, please refer to the product data sheet for the respective product. (available at www.q-cells.us) Ä For maximum energy yields, mismatches of specified electric current (IMPP) of more than 5 % should be avoided for all modules connected in series. Safety Factor During normal operation, a module may generate a greater current and / or higher voltage than that determined under standardized test conditions.
3 INSTALLATION 3.1 SAFETY AND TRANSPORT NOTE! Module damage may occur! Ä Never lift or move the module with the connection cables or junction box. Ä Carry modules upright and horizontally as shown. NOTE! Module damage may occur! Ä Do not drop modules. 3 INSTALLATION 3.2 PREPARATION OF INSTALLATION NOTE! Module damage may occur! Ä Never step on modules. Ä Do not subject modules to any mechanical stress. Ä Do not allow any objects to fall onto modules.
3 INSTALLATION 3.3 MODULE INSTALLATION Option 1: Ä Fasten the module with 4 clamps in the specified clamping range, see Fig. 2, p. 7. Ä Tighten clamps according to manufacturer’s instructions. 4 ELECTRICAL CONNECTION 4.1 SAFETY Ä Maintain an interval of at least 0.39 in (10 mm) between two modules along the short side and 0.20 in (5 mm) along the long side. n 0i ) 0.2mm (5 ) 0.39 in (10mm Option 2: Ä Install the module at the 4 mounting points, see Fig. 2, p. 7.
4 ELECTRICAL CONNECTION 4.2 ELECTRICAL INSTALLATION SAFETY DANGER! Risk of fatal injury due to electric shock! 4 ELECTRICAL CONNECTION 4.3 CONNECTION OF MODULES DANGER! Risk of fatal injury due to electric shock! Ä Electrical work may only be performed by qualified and skilled personnel (see page 3). Ä Ensure correct polarity. Ä Never plug or unplug the cable when under load. Modules must not carry any current. 1. Switch off the inverter.
4 ELECTRICAL CONNECTION 4.4 AFTER INSTALLATION Ä Ensure that all necessary safety and functional tests have been carried out according to applicable standards. 5 NOTE! Module damage may occur! Ä Ensure that the plug connections are secured away from any water-channelling surface. GROUNDING Protective Grounding Option B: Integrated grounding methods In order to prevent electrical shock or fire, the frame of the module as well as any non-current-carrying metal parts of the system must be grounded.
6 FAULTS AND DEFECTS DANGER! Risk of fatal injury due to electric shock! Ä Do not attempt to fix any problems yourself (e.g. glass cracks, damaged cables). Ä Please contact an installer or Q CELLS Technical Customer Service Department. 7 DISPOSAL Ä Do not disconnect modules yourself. Ä Please commission a trade specialist. Ä Dispose of modules in accordance with the local disposal regulations.