Installation Manual
INSTRUCTIONS FOR ULTRAWELD
®
GROUNDING CONNECTIONS - CABLE TO CABLE
BS
Butt cables under cen-
ter of tap hole for 750
MCM and smaller. For
800 MCM and larger,
gap cables 1/8” under
center of tap hole.
VBS
Place end of lower cable
to center of tap hole, then
butt upper cable against
lower cable.
RT
Place run cable into
mold. Butt tap cable
against run cable.
RVT
Butt tap cable against
run cable.
XX
Butt tap cable against
run cable.
PB
Place end of tap cable
under center of tap hole.
Do not cut run cable or
try to splice cables in this
mold.
PT
For 350 MCM and larger,
cut and gap tap cable
1/4” under center of tap
hole. Do not cut cable for
heavy duty molds.
XO
With XO molds, cables
are uncut.
Instruction Sheet BSRevised 6/13/11