Installation Instructions

Integration and Test, RBS 884 Pico (850 MHz and 1900 MHz)
3. Define the RP pair that controls the transcoder magazine
(MBTRCs/MBTRC).
4. Assign software to the RP pair controlling the transcoders.
Define EMs
5. Define the EM for ETCs.
6. Define the EMs for MBTRAC/MBTRC.
7. Define the EM that will control the CLC or path.
Define SNT and Provide Allocation
8. Define Switching Network Terminal (SNT) for the ETC equipment
to control the software/hardware connections through the Group
Switch (GS).
9. Provide an SNT allocation in the GS (for MBTRAC/MBTRC).
Connect Devices
10. Connect the ETCs to the SNT in the group sw
itch.
11. Connect the MBTRAC/MBTRC to the SNT in the group switch.
12. Connect the MBLT861/86/86N devices to SNT in the group switch.
Note: Use MBLT861 for E1 connection and
MBLT86/MBLT86N for T1 connection
.
Deblock Devices and Establish DIPs
13. Deblock MBTRACs/MBTRCs and SNTs.
14. Define the Digital Paths (DIPs)
.
15. Allocate DIP data.
5-24 1532-AE/LZB 119 3834 Uae Rev PA4 2001-04-04