3.4.6 Connect the T1 Network
Connect the high-speed digital T1 (telephone) network Interface to the Site Access Server
as defined by the Site Deployment Order.
NOTE
In most installations, this connection goes to microwave equipment.
3.4.7 Site Clean Up
Before leaving, remove any debris, such as wire clippings, metal shavings, dust mounds,
etc. from the site.
3.5 COMPLETING THE INSTALLATION
Once the OpenSky equipment has been installed, perform field testing as detailed in
Section 4.0 SITE TEST PROCEDURES to verify operation according to specifications of
installed equipment racks with externally connected subsystems such as antennas.
Procedures
:
1. Perform testing to verify correct operation and performance of the installed
equipment racks, following the procedures specified in Section 4.0 SITE TEST
PROCEDURES.
2. Set HPA transmission power level, following the procedure specified in Section
7.06.7 -TX POWER CALIBRATION (MANDATORY).
3. If problems occur during installation, describe them and detail how they were
resolved. If the installation could not be completed, describe the obstacles and clearly
explain what was done and what remains to be done.