4.0 SITE TEST PROCEDURES
4.1 PURPOSE AND SCOPE
This section describes post installation tests required for compliance testing of the M/A-
COM Wireless Systems OpenSky Digital Base Station. This section defines and details
the test plan and methodology for each test.
Objective: This test confirms a base site receive channel is not corrupted by site specific
noise or interference. Site installation and site gain optimization should be completed
before this test is performed. The NIMCAS site optimization program provides an
expected difference between terminated and antenna connected quieting tests. Measured
results should be within 2 dB of this value.
This section covers tests that perform two functions:
Verify that all contractual requirements as detailed in the system Requirements
Traceability Verification Matrix, (RTVM), are met. These tests are identified as
mandatory and are linked to the relevant section for the RTVM.
Ensure that the site, as installed, is operating at optimum performance. These tests are
not mandatory but clearly have impact on some of those that are.
To ensure that the system is installed and configured correctly, the following procedures
must be performed. In addition, several tests are performed to validate the RF
performance of the station and to ensure compliance with the station FCC license.
This section is therefore divided into the following areas:
Verification Testing
Equipment Configuration
Compliance Testing
Performance Testing
Operational Testing
Network Connectivity
Final Operating Capability
Appendices: Supplemental information on equipment configuration and control
access.
Base Site Configuration Procedure should also be consulted for configuration
questions (see APPENDIX F - TYPICAL BASE STATION
CONFIGURATION).
Installed Site Cavity Tuning Procedure should also be consulted for Filter Tuning
(see APPENDIX H - VERIFICATION TESTING – TRANSMIT FILTER
TUNING).