4.7 INSPECTION
In this section, the location of the installation is recorded and equipment configuration
parameters are verified against the As Built. In addition, general workmanship and
quality of assembly and installation are inspected
NOTE
Only selected parameters are checked against the recorded factory configuration as all
parameters are programmed into equipment before leaving the factory and hence should
not require to be modified.
4.7.1 Pre-test Inspection
Objective: To verify that the site installation has been satisfactorily completed and that
newly installed cable interfaces have been correctly connected, especially inter-rack
cabling disconnected during shipment.
NOTE
Before commencing this section of tests, ENSURE THAT ALL RACK CIRCUIT
BREAKERS ARE IN THE OFF POSITION.
PRE-TEST
INSPECTION
ACTION MISCELLANEOUS
1.
A two rack three channel base station is
as shown in the figure to the right. Rack
1 (on left) contains system transceivers,
communication interfaces and control
and monitoring equipment; Rack 2 (on
right) contains transmit path RF power
amplifiers and combining equipment
.