User Manual

MM102225V1, Rev. B
42
5.0 EQUIPMENT CONFIGURATION
The objective of this procedure is to verify that base station equipment has been correctly
programmed for the site at which it is installed. Testing involves connecting a laptop
computer to each piece of equipment and interrogating and recording configuration files.
A record of the configuration files will be shipped with the radio rack. Compare the
pertinent parameters with the highlighted parameters as indicated on the final
configuration documents from staging.
Required Test Equipment
:
Laptop with Floppy Disk Drive
PC operating system and HyperTerminal
Blank floppy disk
Cisco® "Black Connection Cable"
Cisco 9-pin "D" shell to RJ-45 adapter
Or, 9-Pin Male to 9-Pin Female w/Null Adapter