7.0 OPERATIONAL TESTING
7.1
STANDALONE SITE ACCEPTANCE (MANDATORY)
Objective: To verify correct functionality of the site in a standalone mode of operation.
Successful completion of this series of tests together with all preceding mandatory tests
will allow full operation of the site in standalone or repeater mode. This stage of site
certification permits its use in the event that backhaul communications are not available.
7.1.1
Preparation - Remove ALL Network Connectivity
STEPS ACTION MISCELLANEOUS
1.
Ensure that all cables removed for
testing are re-connected for normal site
operation.
2.
Disconnect cable from SAS CTRL 0
Port.
Removes the T1 Network connectivity.
3.
Disconnect the ISM Ethernet connection
if the site has an ISM option.
7.1.2 Procedure for Single Site Trunking
STEPS ACTION MISCELLANEOUS
1.
Set all HPA ENABLE/DISABLE
switches to the ENABLE position.
2.
Configure two mobile or portable
radios using the station parameters of the
site under test.
Radios should be set to factory default
configurations by removing record for
current OTP mode. ie: ATZ-1
**ERASERECORDMODE9
3.
Power cycle the radios using their front
panel power switch and perform a unit-
to-unit test transmission.
4.
Confirm default talk groups are
configured in the radios.
*6# via DTMF M-803, P801.
5.
Enable all HPA’s. Select the same RF
channel and different talk groups for
both radios. Key the radio transmitters
simultaneously and verify one of the
radios trunks to a different RF channel.
Repeat for all RF channels allocated to
site.