User Manual

MM102225V1, Rev. B
7
Title Publication Number
OE-100 Outdoor Enclosure........................................
MM102226V1
M/A-COM, Inc. Quality Standards Manual...............
GQM0221
Rack Breaker Panel Maintenance Manual.................
(Not Available)
RX Amplifier Maintenance Manual ..........................
(Not Available)
Duplexer and Power Sensor
Maintenance Manual .................................................
(Not Available)
TX Combiner Maintenance Manual ..........................
(Not Available)
1.3. TOOLS AND TEST EQUIPMENT
The items listed in Table 1-1: Tools and Test Equipment are the tools and test equipment
needed during installation, alignment, testing, and maintenance of the OpenSky Base
Station/Tower equipment racks. Test equipment other than that recommended may be
substituted, providing it is electrically equivalent in accuracy and operating range, and
capable of maintaining the tolerances specified for the recommended test equipment.
Table 1-1: Tools and Test Equipment
NAME OF TOOL USE/COMMENTS
Assorted Cabling
Hardware (lugs, bolts,
connectors, clamps, and so
on)
As needed for rack installation
Assorted Hand Tools
As needed for rack installation
Assorted Power Tools
As needed for rack installation
Bolting Template
Template for bolt placement on enclosure floor for rack
fasteners
DC Power Cable
For bringing power to equipment racks
Equipment Cart (1,200
pound recommended
capacity)
Moving equipment racks
Ground Cable (#6, green)
For grounding equipment racks
Insulating Bushings
Used to insulate equipment racks from the bolts securing the
racks to cement and raised floors
Knife, Shears, and so on
Cutting strapping around rack packaging
Lag Bolts
Bolting equipment racks to wood enclosure floor
One (3/4”) inch Drop-Down
Expanding Anchors
Bolting equipment racks to enclosure floor
Permanent Marker
Marking locations on enclosure floor for rack fasteners
Shim Material
Leveling equipment racks