Instructions / Assembly

THANK YOU!
6
ASSEMBLY INSTRUCTIONS
FIG. 1 & 2
1. Attach Tubes 2 (#2) to Tube 3 and Tube 4 (#3 & #4) using spring lock (pre-installed) as shown in FIG.1.
2. Attach Tubes 7 (#7) to Tubes 8 (#8) using spring lock (pre-installed) as shown in FIG.2
2
2
2
3
3
4
4
7
8
X 2
X 1
X 1
X 2
X 2
FIG. 1
FIG. 2
Punched hole
7
8
A2
Spring Lock
A2
Spring Lock
FIG. 3
A2
Spring Lock
5
6
5
6
X 1
X 1
FIG. 3
3. Attach Tube 5 and Tube 6 (#5 & #6) together using spring lock (pre-installed) as shown in FIG.3.