Owner’s Manual Havis Docking Station For Getac T800 Rugged Tablet DS-GTC-400 Series DS-GTC-401 DS-GTC-401-3 DS-GTC-402 DS-GTC-402-3 DS-GTC-403 DS-GTC-403-3 Havis, Inc. 75 Jacksonville Road Warminster, PA 18974 www.havis.com 1-800-524-9900 www.havis.
Before Beginning (Original Instructions) Havis is pleased to provide this Owner’s Manual to aid in the proper installation and use of the DS-GTC-400 Series Docking Station for the Getac T800 Rugged Tablet. For questions regarding the set-up of your DS-GTC-400 Series Docking Station, please contact Havis at 1-800-524-9900 or visit www.havis.com for additional product support and information.
Operation - Undocking Table of Contents 1) If previously locked, unlock Docking Station using supplied key. Specifications 3 Parts Included 4 Port Replication Capability 5 Antenna Identification 5 Installation 6 Cable Management 7 Operation - Docking 8 Operation - Undocking 10 2) Secure tablet to avoid inadvertent ejection from Docking Station. Push down on the Barrel Lock button and release quickly taking care not to obstruct the travel of the Latch Hook.
Parts Included Operation - Docking Docking Station 2) Hold tablet in landscape orientation, with bottom mounted docking connector angled toward Docking Station. Lower tablet into the bottom of the Docking Station. Barrel Lock Latch Hook Locator Pin RF Antenna to Tablet Interface Docking Connector 3) Pivot tablet so the top aligns with the Locator Pin at the top of the Docking Station. Depress the Latch Handle to secure tablet in place. You will hear an audible click when Latch Hook is fully engaged.
Operation - Docking Parts Included (continued) Hardware Kit DO NOT FORCE TABLET ONTO DOCKING STATION. IF THERE IS RESISTANCE, CHECK ALIGNMENT OF TABLET ON DOCKING STATION. NOTE: Ensure a proper connection by aligning the tablet’s Alignment Sockets with the Docking Station’s Alignment Posts This Hardware Kit includes: 1. Zip Ties (4) 2. Keys (2) 3. M4 x 0.7 x 20mm long Pan Head Screws (5) 4. Split Lock Washers (5) 5.
Installation Cable Management 1) Install the Docking Station to the Motion Device using four (4) M4 x 0.7 x 20mm long Pan Head Screws (Hardware Kit Item 3), four (4) Split Lock Washers (Hardware Kit Item 4), and four (4) Washers, M4 (Hardware Kit Item 5). Torque screws to 20 in-lbs (2.3Nm) ± 10%. 1) Tip the Docking Station to a position that is comfortable to work with. Washer, M4 Lock Washer 2) Install all cables that are necessary for computing needs.
Installation Cable Management 1) Install the Docking Station to the Motion Device using four (4) M4 x 0.7 x 20mm long Pan Head Screws (Hardware Kit Item 3), four (4) Split Lock Washers (Hardware Kit Item 4), and four (4) Washers, M4 (Hardware Kit Item 5). Torque screws to 20 in-lbs (2.3Nm) ± 10%. 1) Tip the Docking Station to a position that is comfortable to work with. Washer, M4 Lock Washer 2) Install all cables that are necessary for computing needs.
Operation - Docking Parts Included (continued) Hardware Kit DO NOT FORCE TABLET ONTO DOCKING STATION. IF THERE IS RESISTANCE, CHECK ALIGNMENT OF TABLET ON DOCKING STATION. NOTE: Ensure a proper connection by aligning the tablet’s Alignment Sockets with the Docking Station’s Alignment Posts This Hardware Kit includes: 1. Zip Ties (4) 2. Keys (2) 3. M4 x 0.7 x 20mm long Pan Head Screws (5) 4. Split Lock Washers (5) 5.
Parts Included Operation - Docking Docking Station 2) Hold tablet in landscape orientation, with bottom mounted docking connector angled toward Docking Station. Lower tablet into the bottom of the Docking Station. Barrel Lock Latch Hook Locator Pin RF Antenna to Tablet Interface Docking Connector 3) Pivot tablet so the top aligns with the Locator Pin at the top of the Docking Station. Depress the Latch Handle to secure tablet in place. You will hear an audible click when Latch Hook is fully engaged.
Operation - Undocking Table of Contents 1) If previously locked, unlock Docking Station using supplied key. Specifications 3 Parts Included 4 Port Replication Capability 5 Antenna Identification 5 Installation 6 Cable Management 7 Operation - Docking 8 Operation - Undocking 10 2) Secure tablet to avoid inadvertent ejection from Docking Station. Push down on the Barrel Lock button and release quickly taking care not to obstruct the travel of the Latch Hook.
Before Beginning (Original Instructions) Havis is pleased to provide this Owner’s Manual to aid in the proper installation and use of the DS-GTC-400 Series Docking Station for the Getac T800 Rugged Tablet. For questions regarding the set-up of your DS-GTC-400 Series Docking Station, please contact Havis at 1-800-524-9900 or visit www.havis.com for additional product support and information.
Owner’s Manual Havis Docking Station For Getac T800 Rugged Tablet DS-GTC-400 Series DS-GTC-401 DS-GTC-401-3 DS-GTC-402 DS-GTC-402-3 DS-GTC-403 DS-GTC-403-3 Havis, Inc. 75 Jacksonville Road Warminster, PA 18974 www.havis.com 1-800-524-9900 www.havis.