Owner's manual

Hawkeye Industries Inc.
2
Pass the cut end of the cable over the indicator cable pulley and through
the hole in the top bracket of the indicator guide assembly. Feed the cable
through the center hole of the indicator.
6.)
With slight tension on the cable to keep the float barely off the tank floor,
slide the indicator over the cable to the minimum level on the gauge
board.
SLIGHT TENSION TO KEEP FLOAT
BARELY ON TANK FLOOR
SLIDE INDICATOR TO THE MINIUMUM
LEVEL ON THE GAUGEBOARD
7.)
Tighten the indicator set screw. Cut off the excess cable.
CUT OFF EXCESS
TIGHTEN THUMB SCREW
7.)
Model 750 Installaton Complete
Feed the stud and cable through the center hole of the float and replace
the nut and washer. Tighten the nut until there are three threads showing.
5.)