6770-CB STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@yardline.
(This page intentionally left blank.
GABLE 10' x 8' (305 x 244) ASSEMBLY MANUAL BUILDING SIZE BASE MODEL ADD ONE 10' x 4' ADD TWO 10' x 4' 10' x 8' (305 x 244 cm) 10' x 12' (305 x 365,8 cm) 10' x 16' (305 x 487,7 cm) 16770-CB 03/13/2018 ACTUAL FLOOR SIZE 10' x 7' 8-5/8" (305 x 235,3 cm) 10' x 11' 8-5/8" (305 x 357,2 cm) 10' x 15' 8-5/8" (305 x 479 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
TOOLS Required ❑ Phillips Screwdriver Optional ❑ Tool Belt/ Nail Pouch ❑ Utility Knife ❑ Shingle Blades ❑ Drill / Driver ❑ 3/8" Drill Bit ❑ #2 Philips Drive Bit ❑ Tin Snips (for drip edge) ❑ Caulk Gun ❑ Hammer ❑ Chalk Line ❑ Paint Tools ❑ Level ❑ Nail Gun ❑ Pencil ❑ Safety Glasses ❑ Tape Measure ❑ Ladder ❑ Square • gun nails ❑ Gloves or Safety! Always use approved safety glasses during assembly.
PARTS IDENTIFICATION AND SIZES Part identification is stamped on some parts. WOOD SIZE CONVERSION CHART Treated lumber is stamped: Nominal Board Size Actual Size 2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) RS 1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm) RS 2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm) • Check these locations for part stamp. WALL 10x8' 10x12' 10x16' PARTS LIST INVENTORY YOUR PARTS before you begin.
WALL PANEL & DOORS PARTS LIST x1 RIGHT x1 LEFT x4 3/8 x 48 x 72" (1 x 122 x 183 cm) x2 x1 x1 x1 x1 x1 LEFT DOOR x1 RIGHT DOOR ROOF PANELS 48" x 96" (122 x 244 cm) x2 19" x 96" (48 x 244 cm) x2 Roof panels are 7/16" (11 mm) thick.
ROOF PANELS x2 10 x 8' x2 10 x 12' 19" x 96" (48 x 244 cm) x2 Roof panels are 7/16" (11 mm) thick. x1 x2 x2 x2 10 x 16' 48" x 96" (122 x 244 cm) x2 x2 2" (5,0 cm) 1 lb. of 2" (5,0 cm) 48" x 96" (122 x 244 cm) x2 19" x 48" (48 x 122 cm) Roof panels are 7/16" (11 mm) thick. x2 48" x 48" (122 x 122 cm) 19" x 96" (48 x 244 cm) 2" (5,0 cm) 1 lb. of 2" (5,0 cm) 48" x 96" (122 x 244 cm) x4 19" x 48" (48 x 122 cm) Roof panels are 7/16" (11 mm) thick.
ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • Your shed kit does not include a wood floor frame or floor panel materials. • See page 8 for the additional oor panel sizes and quantities required. • This shed does not include any leveling materials. • See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your oor, as this will vary depending on your speci c site.
CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below. Attach the sill plates on the foundaton as shown, and continue on to page 21. Treated Sill Plate Caulk between sill plate and concrete.
FLOOR FRAME (Not Included) 10 x 8' x2 x2 x6 2 x 4 x 48" (5 x 10 x 122 cm) 10 x 12' x6 x4 x4 x6 2 x 4 x 45" (5 x 10 x 114,3 cm) 10 x 16' You may need treated 2 x 4" boards cut to size and nails to complete your floor. Floor panel sizes and quantities are shown below. MUST be treated lumber.
OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS (Typical for 10' x 12' Kit) Seam Runners are generally 12" (30,5 cm) from ends of floor frame and under seams. 4x4 Runners (not included). 12" (30,5 cm) 40-5/16" (102,4 cm) Centered MATERIAL REQUIRED DO Measurements to centers of 4x4's.
10' x 8' FLOOR FRAME (Not Included) PARTS REQUIRED: x6 x2 3" (7,6 cm) 2 x 4 x 72" (5 x 10 x 183 cm) Treated Wood 2 x 4 x 89-1/2" (5 x 10 x 227 cm) Treated Wood 2 x 4 x 48" (5 x 10 x 122 cm) Treated Wood BEGIN Orient parts as shown on flat surface. Measure and mark from end of boards. 2 Use two 3" nails at each mark. 3 O O FINISH R 1 D x2 x28 You have finished your 10' x 8' floor frame. If building 10' x 8' kit go to page 13. If building 10' x 12' kit go to page 11.
10 x 12' FLOOR FRAME (Not Included) PARTS REQUIRED: x2 x2 x6 x28 3" (7,6 cm) 2 x 4 x 72" (5 x 10 x 183 cm) 2 x 4 x 48" (5 x 10 x 122 cm) 2 x 4 x 45" (5 x 10 x 114,3 cm) BEGIN You will build two floor sections. Follow steps 1-3 on page 10 to build front 10' x 8' floor section 1. 2 Orient parts as shown on flat surface to build back section 2. Measure and mark each dimension from end of boards. 3 Use two 3" nails at each mark. Go to page 14.
10 x 16' FLOOR FRAME (Not Included) PARTS REQUIRED: x2 x2 x6 x28 3" (7,6 cm) 2 x 4 x 72" (5 x 10 x 183 cm) 2 x 4 x 48" (5 x 10 x 122 cm) 2 x 4 x 93 " (5 x 10 x 236,2 cm) BEGIN You will build two floor sections. Follow steps 1-3 on page 10 to build front 10' x 8' floor section 1. 2 Orient parts as shown on flat surface to build back section 2. Measure and mark each dimension from end of boards. 3 Use two 3" nails at each mark. Go to page 15.
LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN 1 See page 9 for the preferred floor leveling method. Use level and check the frame is level before applying floor panels. 3 Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square.
10 x 12' FLOOR FRAME (Not Included) x20 4 3" (7,6 cm) Put both floor sections together and attach as shown using 3" nails. FINISH 5 You have finished your floor frame. Proceed to level and square frame. D O O R (4) Nails per side, stagger pattern. 140-5/8" (357,2 cm) DO 120" (305 cm) OR Section 2 Section 1 LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed.
10 x 16' FLOOR FRAME (Not Included) x20 4 3" (7,6 cm) Put both floor sections together and attach as shown using 3" nails. FINISH 5 You have finished your floor frame. Proceed to level and square frame. D Section 2 O O R (4) Nails per side, stagger pattern. Section 1 DO 120" (305 cm) OR 188-5/8" (479 cm) LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed.
10' x 8' FLOOR PANELS (Not Included) PARTS REQUIRED: x1 x55 48" x 92-5/8" (122 x 235,3 cm) 2" (5 cm) FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZES AND QUANTITIES. Ensure your floor frame is square by installing one panel and squaring frame. BEGIN Attach the 48 x 92-5/8" panel with the rough side up (painted-grid lines side) with the 48" edge and corner flush to the floor frame (Fig A). Secure panel with two 2" nails in the corners. 2 Move to the opposite end.
10' x 8' FLOOR PANELS (Not Included) PARTS REQUIRED: x1 x95 FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZES AND QUANTITIES. x1 48" x 92-5/8" (122 x 235,3 cm) 2" (5 cm) 5/8 x 23-7/8 x 92-5/8" (1,6 x 61 x 235 cm) Continue installing panels with rough side up (painted grid lines). 6 Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. .
10' x 12' FLOOR PANELS (Not Included) PARTS REQUIRED: x55 FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZES AND QUANTITIES. 48" x 48" (122 x 122 cm) x1 2" (5 cm) BEGIN Attach the 48 x 48" panel with the rough side up (painted-grid lines side) on Section 2 with the 48" edge and corner flush to the floor frame and Section 1. 2 Secure using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre-painted grid lines to nail into joists under panel.
10' x 12' FLOOR PANELS (Not Included) PARTS REQUIRED: x1 x95 x1 48" x 48" (122 x 122 cm) 5/8 x 23-7/8 x 48" (1,6 x 61 x 122 cm) 2" (5 cm) FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZES AND QUANTITIES. Continue installing panels with rough side up (painted grid lines) as shown. 4 Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. . D O O R 3 FINISH 5 You have finished Installing your floor panels. Continue on page 22.
10' x 16' FLOOR PANELS (Not Included) PARTS REQUIRED: x1 x55 48" x 96" (122 x 244 cm) FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZES AND QUANTITIES. 2" (5 cm) BEGIN Position the 48 x 96" panel with the rough side up (painted-grid lines side) with the 96" edge and corner flush to the floor frame and Section 1. 2 Secure the panel using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre-painted grid lines to nail into joists under panel.
10' x 16' FLOOR PANELS (Not Included) PARTS REQUIRED: x1 x95 FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZES AND QUANTITIES. x1 5/8 x 48 x 96" (1,6 x 122 x 244 cm) 2" (5 cm) 5/8 x 23-7/8 x 96" (1,6 x 61 x 244 cm) 3 Continue installing panels with rough side up (painted grid lines). 4 Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. . FINISH 120" (305 cm) 48" (122 cm) Flush O O R You have finished Installing your floor panels.
I M PIMPORTANT! O R TA N T ! Check the floor frame is level after installing floor panels. Re-level if needed. OR DO • The floor should used as a stable work surface for wall construction. HINT: • Organize your assembly procedure during the build process to avoid over-handling of the walls.
RAFTER ASSEMBLY JIG x8 PARTS REQUIRED: x4 GBB ¸1 BEGIN 1 x 3 x 7-1/2" (2,5 x 7,6 x 19 cm) Build a Jig to ensure all Rafters are assembled the same. Mark a straight line on the Floor from corner to corner (Fig. A) or on sill plates to fit measurements (Fig. B). 3 Screw blocks in place to measurement shown. FINISH D O O R 2 4 1-1/4" (3,2 cm) Make sure blocks are square and at 125" (317,5 cm) You have finished building a Rafter Jig. (2) 1-1/4" (3,2 cm) Screws per block 125' (317.5 cm) Fig.
RAFTERS PARTS REQUIRED: x6/x10/x14 x6/x10/x14 ¸1 x72 2" (5 cm) 6 x 24" (15 x 61 cm) CV 2 x 4 x 65-7/8" (5 x 10 x 167 cm) BEGIN Place two rafter halves CV on floor jig. You will assemble (4) rafters. 2 Apply glue on gusset and place on rafters. Nail gusset onto rafter using 2" nails, staggered, as shown. 4 Flip over rafter assembly and glue and nail gusset to back side.
BACK WALL FRAME PARTS REQUIRED: x1 x2 x1 x6 NH 3" (7,6 cm) 2 x 3 x 46-1/4" (5 x 7,6 x 117,5 cm) PB 2 x 3 x 77" (5 x 7,6 x 196 cm) PR 2 x 3 x 94-1/2" (5 x 7,6 x 240 cm) BEGIN Orient parts on edge on floor as shown. 2 Nail using two 3" nails at each connection.
BACK WALL FRAME x2 PARTS REQUIRED: x1 3" (7,6 cm) NH 2 x 3 x 46-1/4" (5 x 7,6 x 117,5 cm) 3 Orient parts on edge on floor as shown. 4 Use two 3" screws at middle connection. FINISH O O R You have finished building your back wall frame.
BACK WALL PANELS PARTS REQUIRED: x32 2" (5 cm) 3/8 x 48 x 84" (1 x 122 x 213,4 cm) x1 3/4" GAUGE BLOCK Use a 3/4" gauge block at edges of panel. 3 Nail using 2" nails 6" apart on edges and 12" apart inside panel. 3/4" (1,9 cm) . O 2 O Place LEFT panel on back frame as shown with primed side facing up. D 1 R BEGIN Do not nail in groove. For squareness maintain 3/4" measurement along panel edges.
BACK WALL PANELS PARTS REQUIRED: x32 3/4" GAUGE BLOCK 4 Place RIGHT panel on back frame as shown with primed side facing up. 5 Use a 3/4" gauge block at edges of panel. 6 Nail using 2" nails 6" apart on edges and 12" apart inside panel. O R . O 3/8 x 48 x 84" (1 x 122 x 213,4 cm) x1 2" (5 cm) D Do not nail in groove. To draw panels tight at seams angle nail.
WING WALL PANELS PARTS REQUIRED: x32 x2 RIGHT x2 LEFT x4 1-1/4" (3 cm) OY 2 x 3 x 72" (5 x 7,6 x 183 cm) BEGIN You will assemble TWO RIGHT and TWO LEFT wing walls. 2 Place OY on floor. Place a wing wall panel primed side down onto OY (Fig. A) and flush to panel edges as shown. 3 Secure flush to edges using eight 1-1/4 screws 10" apart. 4 You have finished building two sets of wing wall assemblies. Set ONE LEFT and ONE RIGHT aside. Continue building your back wall. D O O R 1 Fig A.
BACK WALL PANELS PARTS REQUIRED: x24 2" (5 cm) Pre-assembled x1 LEFT x1 Pre-assembled RIGHT Place wing wall assemblies onto frame with bottom of panels flush. 6 Nail left and right wing wall assemblies onto back wall frame using 2" nails 6" apart. Do not nail in groove. R 5 7 D O O FINISH You have finished attaching your wing walls. Primed side UP 6" (15,cm) LEFT Primed side UP Flush 6" (15 cm) HINT: To draw panels tight at seams angle nail. RIGHT Flush Use a 2x3" for support.
BACK WALL GABLE PANELS PARTS REQUIRED: 2" (5 cm) x6 3/4" GAUGE BLOCK x1 RIGHT x1 LEFT x6 GAA BEGIN Place left gable panel onto frame primed side up and flush to left panel. NOTE: Panel grooves will not align. 2 Use a 3/4" gauge block at edge of panel. Nail using 2" nails along edge as shown. D O O R 1 Use a 2x3" for support. Primed side UP 3/4" (1,9 cm) Flush Gauge Block 3 Place right gable panel onto frame primed side up and flush to left panel. NOTE: Panel grooves will not align.
FRONT WALL FRAME PARTS REQUIRED: x1 x2 x1 x6 3" (7,6 cm) LT 2 x 3 x 22-1/8" (5 x 7,6 x 56 cm) PB 2 x 3 x 77" (5 x 7,6 x 196 cm) PR 2 x 3 x 94-1/2" (5 x 7,6 x 240 cm) 2 Nail two PB to PR with two 3" nails at each end. 3 Ensure LT is centered with PR and nail in place with two 3" nails. O O Lay out two PB, one PR and one LT on edge on floor. D 1 R BEGIN FINISH 4 You have finished building your Front Wall Frame.
FRONT WALL PANELS x22 PARTS REQUIRED: 2" (5 cm) x1 3/4" GAUGE BLOCK BEGIN 1 Place LEFT panel on front frame as shown with primed side up. 2 Use a 3/4" gauge block on edges of panel. 3 Nail panel to frame with 2" nails 6" apart. D O O R Do not nail in groove. For squareness, maintain 3/4" measurements along panel edges. 1" (2,5 cm) 3/4" GAUGE BLOCK 3/4" (1,9 cm) 6" (15,2 cm) 3/4" (1,9 cm) 6" Primed Side (15,2 cm) UP 3/4" GAUGE BLOCK 97-1/2" (247,7 cm) 33 3/4" (1,9 cm) 3/4" (1.
FRONT WALL PANELS x22 PARTS REQUIRED: 2" (5 cm) 3/4" GAUGE BLOCK 4 Place RIGHT panel on front frame primed side up. 5 Use a 3/4" gauge block on edges of panel. 6 Nail panel to frame with 2" nails 6" apart. R Do not nail in groove. D O O x1 To draw panels tight at seams angle nail. Primed Side UP Panels Flush 3/4" (1,9 cm) 6" (15,2 cm) 97-1/2" (247,7 cm) 3/4" (1,9 cm) 1" (2,5 cm) For squareness, maintain 3/4" and 97-1/2" measurements.
FRONT WALL PANELS PARTS REQUIRED: x24 x1 LEFT x1 Pre-assembled RIGHT 7 Place wing wall panels onto frame with bottom of panels flush. 8 Nail left and right wing wall assemblies using 2" nails 6" apart. O O R Do not nail in groove. D FINISH 9 2" (5 cm) Pre-assembled You have finished attaching your wing walls. Primed Side UP 6" (15,2 cm) 6" (15,2 cm) Flush To draw panels tight at seams angle nail. Flush Use a 2x3" for support.
SIDE WALL FRAMES PARTS REQUIRED: x4 x6 x2 x14 3" (7,6 cm) 7/16 x 2-1/2 x 24-3/4" (1,1 x 6,4 x 62,9 cm) OV 2 x 3 x 69" (5 x 7,6 x 175 cm) PM 2 x 3 x 92-5/8" (5 x 7,6 x 235,3 cm) BEGIN 1 If building 10' x 12' kit goto page 38. If building 10' x 16' kit go to page 42. 2 If building 10' x 8' kit orient parts on edge on floor. Measure and mark from end of boards. 3 Use two 3" nails at each mark. 22-1/4" (57 cm) D O O R IMPORTANT! You will build two walls the same.
10' x 8' SIDE WALL FRAME- SOFFIT PARTS REQUIRED: x2 4 x22 1-1/4" (3,2 cm) 3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm) Place panel onto 2 x 3 with primed side against 2 x 3 (Fig A) Keep panel flush along entire edge of 2 x 3 top plate (Fig A). O O R Attach soffit panel flush to 2 x 3 (Fig A) and with 3/8" offset at ends (Fig. B, C) using eleven 1-1/4" screws. D 5 9-1/2" (24 cm) 3/8" (10 mm) Fig. B 3/8" (10 mm) 93-1/4" (236,9 cm) Fig. C PRIMED SIDE Flush Fig.
10' x 8' SIDE WALL PANELS PARTS REQUIRED: x2 6 x58 2" (5 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 72" (1 x 122 x 183 cm) Ensure your wall frame is square by installing one panel and squaring frame. Place the 48 x 72" panel onto wall frame with primed side up as shown. Note the lip and square edges. D O O R Use the gauge block to mark the 3/4" measurement on the wall stud. Locate the panel flush under the soffit panel. Secure panel with two 2" nails in the corners (Fig. A). 7 Move to the opposite end.
10' x 8' SIDE WALL PANELS PARTS REQUIRED: x2 9 x58 2" (5 cm) 3/8" x 48" x 72" (1 x 122 x 183 cm) Place 48" panel on frame as shown with primed side facing up. NOTE THE SQUARE AND LIP EDGES. Do not nail in groove. D O O R Nail using 2" nails 6" apart on edges and 12" apart inside panel. Flush To draw panels tight at seams angle nail. 12" (30 cm) 6" (15 cm) LIP EDGE 48" (122 cm) SQUARE EDGE D O O R Carefully flip your sidewall over. Repeat STEPS 1-9 to assemble your second side wall.
10' x 12' SIDE WALL FRAMES PARTS REQUIRED: x4 x6 x2 x2 7/16 x 2-1/2 x 24-3/4" (1,1 x 6,4 x 62,9 cm) x2 OV 2 x 3 x 69" (5 x 7,6 x 175 cm) x28 3" (7,6 cm) 7/16 x 2-1/2 x 48 (1,1 x 6,4 x 122 cm) NK 2 x 3 x 48" (5 x 7,6 x 122 cm) PM 2 x 3 x 92-5/8" (5 x 7,6 x 235,3 cm) BEGIN 1 If building 10' x 16' kit go to page 42. 2 If building 10' x 12' kit orient parts on edge on floor. Measure and mark from end of boards. 3 D O O R IMPORTANT! You will build two walls the same.
10' x 12' SIDE WALL FRAME- SOFFIT PARTS REQUIRED: x2 x2 4 x32 1-1/4" (3,2 cm) 3/8 x 5 x 48" (0,9 x 12,7 x 122 cm) 3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm) Place panels onto 2 x 3 with primed side against 2 x 3 as shown (Fig A) Keep panel flush along entire edge of 2 x 3 top plate (Fig A). R Attach soffit panels flush to 2 x 3 (Fig A) and with 3/8" offset at ends (Fig. B, C) using fourteen 1-1/4" screws. D O O 5 3/8" (10 mm) Fig.
10' x 12' SIDE WALL PANELS PARTS REQUIRED: x2 x58 2" (5 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 72" (1 x 122 x 183 cm) Ensure your wall frame is square by installing one panel and squaring frame. 6 Place the 48 x 72" panel onto wall frame with primed side up as shown. Note the lip and square edges. D O O R Use the gauge block to mark the 3/4" measurement on the wall stud. Locate the panel flush under the soffit panel. Secure panel with two 2" nails in the corners (Fig. A). 7 Move to the opposite end.
10' x 12' SIDE WALL PANELS PARTS REQUIRED: x4 9 x148 2" (5 cm) 3/8" x 48" x 72" (1 x 122 x 183 cm) Place 48" panels on frame as shown with primed side facing up. NOTE THE SQUARE AND LIP EDGES. Do not nail in groove. D O O R Nail using 2" nails 6" apart on edges and 12" apart inside panel. Flush To draw panels tight at seams angle nail. 12" (30 cm) 6" (15 cm) 48" (122 cm) LIP EDGE D O O R SQUARE EDGE Carefully flip your sidewall over. Repeat STEPS 1-9 to assemble your second side wall.
10' x 16' SIDE WALL FRAMES PARTS REQUIRED: x4 x6 x2 x84 x4 7/16 x 2-1/2 x 24-3/4" (1,1 x 6,4 x 62,9 cm) x2 OV 2 x 3 x 69" (5 x 7,6 x 175 cm) 3" (7,6 cm) 7/16 x 2-1/2 x 48" (1,1 x 6,4 x 122 cm) NK 2 x 3 x 48" (5 x 7,6 x 122 cm) PM 2 x 3 x 92-5/8" (5 x 7,6 x 235,3 cm) BEGIN 1 Measure and mark from end of boards. IMPORTANT! You will build two walls the same. Use two 3" nails at each mark.
10' x 16' SIDE WALL FRAME- SOFFIT PARTS REQUIRED: x4 x2 3 x32 1-1/4" (3,2 cm) 3/8 x 5 x 48" (0,9 x 12,7 x 122 cm) 3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm) Place panels onto 2 x 3 with primed side against 2 x 3 as shown (Fig A) Keep panel flush along entire edge of 2 x 3 top plate (Fig A). Attach soffit panels flush to 2 x 3 (Fig A) and with 3/8" offset at ends (Fig. B, C) using nineteen 1-1/4" screws. D O O R 4 Fig.
10' x 16' SIDE WALL PANELS PARTS REQUIRED: x2 x58 2" (5 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 72" (1 x 122 x 183 cm) Ensure your wall frame is square by installing one panel and squaring frame. 5 Place the 48 x 72" panel onto wall frame with primed side up as shown. Note the lip and square edges. D O O R Use the gauge block to mark the 3/4" measurement on the wall stud. Locate the panel flush under the soffit panel. Secure panel with two 2" nails in the corners (Fig. A). 6 Move to the opposite end.
10' x 16 ' SIDE WALL PANELS PARTS REQUIRED: x6 8 x238 2" (5 cm) 3/8" x 48" x 72" (1 x 122 x 183 cm) Place 48" panels on frame as shown with primed side facing up. NOTE THE SQUARE AND LIP EDGES. Nail using 2" nails 6" apart on edges and 12" apart inside panel. Do not nail in groove. D O O R To draw panels tight at seams angle nail. Flush 12" (30 cm) 6" (15 cm) 48" (122 cm) LIP EDGE 48" (122 cm) SQUARE EDGE Carefully flip your sidewall over.
BACK WALL INSTALLATION PARTS REQUIRED (TEMPORARY): x1 x8 OO x24 1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm) 3" (7,6 cm) 2" (5 cm) BEGIN Center back wall assembly on the 120" (305 cm) floor dimension. 2 Use OO as a temporary brace. Secure with two 3" screws. D O O R 1 ) 05 cm 3" (7,6 cm) Screws 120" (3 3 First, nail lower edge of panel to floor frame using 2" nails 6" apart. Angle nail to hit floor frame (Fig. A). 4 Screw back wall uprights to floor using two 3" screws (Fig. B).
SIDE WALLS INSTALLATION x4/8/12 x30/39/48 x2 3" (7,6 cm) 3" (7,6 cm) 2" (5 cm) Additional fasteners needed for 10' x 12' kit or 10' x 16' kit. Same instructions apply. BEGIN D O O R Stand right sidewall on floor. It is important to secure the sidewall in the following order: 1 Soffit Panel Center sidewall on floor front to back. Panel Nail the lower sidewall corner to the backwall trim with one 2" nail (Fig. A).
FRONT WALL INSTALLATION x8 x36 3" (7,6 cm) 2" (5 cm) BEGIN Stand frontwall on floor. It is important to secure the frontwall in the following order. Soffit Panel R 3/8" (0,9 cm) OVERLAP O O Center frontwall on floor side-to-side. D 1 Trim Panel The sidewall soffit will overlap the frontwall 3/8" (Fig. A). Fig. A Nail the frontwall flush to the floor using 2" nails 6" apart. Angle nails to hit floor frame (Fig. B). Nail the lower sidewall corner to the frontwall trim with one 2" nail (Fig. C).
GABLE TRIM x24 PARTS REQUIRED: x4 ¸1 1-1/4" (3 cm) CDD 2 x 3 x 58" (5 x 7,6 x 147,3 cm) BEGIN 3 Repeat steps 1-2 to attach the back trim. FINISH 4 You have attached your upper trim. Continue to attaching your endcaps. Fig. B O O Position second CDD flush to panel edge and flush to CDD already attached (Fig. A). Attach trim with eight 1-1/4" screws from inside. Install two screws at seam (Fig. B). D 2 R Position one CDD flush to front panel edge and center on right edge of groove (Fig. A).
BACK WALL GABLE TRIM PARTS REQUIRED: x1 ¸1 3/4" (1,9 cm) x11 XMA 11/16 x 2-1/2 x 60-5/8" (1,7 x 6,3 x 154 cm) BEGIN D O O R Clamp or hold trim XMA onto gable panel seam and up against gable trim. Ensure XMA is level. GABLE TRIM SEAM XMA Flush 2 LEVEL Flush From the inside, attach XMA with 3/4" screws as pattern shows. (11) 3/4" (1,9 cm) XMA Screws 2-1/2" (6,3 cm) 1-1/4" (3,2 cm) IN S ID E FINISH 3 You have attached your back wall gable trim.
TRIM / ENDCAPS PARTS REQUIRED: x4 GBB x4 ¸1 x14 1-1/4" (3,2 cm) 1 x 3 x 7-1/2" (2,5 x 7,6 x 19 cm) RIGHT PAINTED RED 3/4 x 5-1/8 x 8-3/8" (1,9 x 13 x 21,3 cm) LEFT PAINTED GREEN BEGIN 3 Locate endcaps flush with upper trim and corner trim and attach each endcap from inside of shed using four 1-1/4" screws as shown (Fig. A). FINISH 4 O O Repeat steps to build two more endcaps. D 2 R Glue 7-1/2" boards onto endcaps, and fasten with 1-1/4" screws, as shown. You have attached your endcaps.
RAFTERS x12 PARTS REQUIRED: x6 pre-assembled 3" (7,6 cm) 2" (5 cm) BEGIN 3 Repeat steps to attach three rafters. D 2 Locate rafters directly over studs and flush to overhang in wall frame (Fig. A). Check that you have the measurements shown. Screw through soffit panel into rafters using one 2" screw (Fig. A). Attach with two 3" screws at each end (Fig. B). Re-tighten 2" screws if neccessary. O O ¸1 R x3 FINISH 4 You have attached your rafters. Fig. B Screw into top plate. Fig.
ROOF PANELS PARTS REQUIRED: x4 2" (5 cm) x2 7/16 x 48 x 96" (1,1 x 122 x 244 cm) Roof panels may cause serious injury until securely fastened. D O O R You must square the roof by attaching one panel fist. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”. BEGIN 1 Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with a 1/8" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B). Flush at peak.
ROOF PANELS PARTS REQUIRED: x90 7/16 x 19 x 96" (1,1 x 48 x 244 cm) x2 Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E). 22-1/4" (56,5 cm) Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel (Fig. F). 24" (61 cm) 24" (61 cm) O O R NOTE: Measurements from inside of panels Move to the top of the panel and keep spacing between the center of the rafters.
TRIM x20 PARTS REQUIRED: x2 ¸1 2" (5 cm) HS 1 x 3 x 94-3/4" (2,5 x 7,6 x 240,6 cm) BEGIN O O R Repeat steps to attach fascia trim on both sides. D 2 Attach fascia trim flush under roof panel (Fig. A) and endcaps at ends of rafters (Fig. B) using 2" (5 cm) nails as shown. FINISH 3 You have attached your fascia trim. Fig. B HS Flush HS Flush Fig.
DOORS PARTS REQUIRED: x1 x2 OO 1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm) x2 HINT: Look for 3/8" SPACER attached to doors. x1 x1 Left Door x1 Right Door x4 1-1/4" (3 cm) 2" (5 cm) 3" (7,6 cm) ZJ 5/8 x 3 x 72" (1,6 x 7,6 x 183 cm) 2 Attach temporary support OO with 3" screws in middle and at ends. Tighten securely. O O Orient parts as shown on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.
DOORS x7 PARTS REQUIRED: x1 OO 3" (7,6 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm) Attach temporary support OO as a ledger board flush under wall panels for doors to rest on, using three 3" screws (Fig. A). D O O R 3 OO Fig. A 4 Flush against wall panels. OO Center doors on right edge of groove as shown (Fig. B). Check ledger board is still flush under panels. 5 Screw hinge boards into wall supports and floor using four 3" screws as shown. Make sure screws go into framing and floor (Fig.
DOOR PARTS REQUIRED: x1 2" (5 cm) x8 ZJ 3/4" (1,9 cm) x52 5/8 x 3 x 72" (1,6 x 7,6 x 183 cm) x1 64" Metal Threshold 1 Secure hinge boards from inside using 3/4" screws as shown (Fig. A). 2 Reinforce the door trim using 3/4" screws through door panel into trim (Fig. A). Locate screws as shown in Fig. B. Use two screws at seams. Center trim ZJ over doors and secure using eight 2" finish nails into framing as shown.
DOOR WEATHERSTRIP PARTS REQUIRED: x2 x14 OO 2" (5 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm) 2 Secure OO using seven 3" screws through outside trim into OO (Fig. B) 3 On right door center OO vertically in door opening (Fig. A). OO will offset the right door 1" IN from the door trim (Fig. C). 4 Secure OO using seven 3" screws through outside trim into OO (Fig. C). O O With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A).
DOOR HARDWARE PARTS REQUIRED: x1 x4 3/4" (1,9 cm) x1 x7 3/8" (9 mm) Drill Bit 3/4" (1,9 cm) With door closed mark hole location for bolt to extend into. HINT: Extend bolt to leave a mark in wood. Tap bolt with hammer. Drill 3/8" hole deep enough for bolt to slide into. 3 Install hasp on right door and latch on left door. Bottom edge of hasp is 35-1/2" (90 cm) up from bottom edge of door trim. Measure and mark locations and install with 3/4" screws as shown (Fig B).
DOOR TRIM DOOR TRIM PARTS REQUIRED: x8 x8 x16 x18 WNA 5/8 x 4 x 14" (1,6 x 10 x 35,6 cm) ZZ 5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm) BEGIN Position parts on lower pane of Door Panel, as shown. 2 Attach each using two 3/4" (19 mm) screws as shown. O D FINISH O R 1 3 3/4" (19 3/4" (1,9mm) cm) You have finished attaching your door trim.
PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges Note: Prime all un-primed exterior wood before painting.
SHINGLES - NOT INCLUDED • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch SHINGLE NAIL PATTERN 1" (2,5 cm) 1/2" (1,3 cm) Notch Sealing Strip 1" (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. BEGIN 1 Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
SHINGLES continued... 2 2 Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck FRONT OF SHED 1" (2,5 cm) Notch - or - BACK OF SHED Flush with starter row. Drip Edge Flush with starter row. Notch 3 Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row. FRONT OF SHED BACK OF SHED 1" (2,5 cm) Notch Flush with rain slots.
SHINGLES continued... 5 Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. Cut Off. 5" (12,7 cm) MAX. CUT Top of rain slot. • If more than 5" to rain slot you must install another row of shingles. 6 Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge. 7 Once both sides are shingled you need to trim ends.
SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN 1 Cut shingles into THREE pieces. Hint: Use cut-off pieces first. 2" (5 cm) 2" (5 cm) 2" (5 cm) 2" (5 cm 2" (5 cm) 2" (5 cm) Score shingle, then snap-off angled cut. Weather Seal Top of slot. Note: • You will need about 20 - 22 cut pieces. 2 20 to 22 Pieces Install first ridge cap flush to shingles at front, as shown. (1) Nail per side through weather seal.
SHINGLES - RIDGE CAP continued... 4 Continue installing ridge cap to back of roof. 5 Make sure there is 4" between the shingle-color and edge of shingles. Trim cap off flush to shingles 6 When you have 4" minimum of shingle color cut one piece to cap your roof. Cap 7 Install flush to shingles. Flush to shingles (2) Nails per side. FINISH 8 You have finished your ridge cap.
WARRANTY REGISTRATION Please complete your warranty registration to properly validate your warranty. Register your product online at:www.OnlineWarranty.net. LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: 1. Every product is warranted from defects in workmanship and manufacturing for 1 year. 2. All accessories, hardware and metal components are warranted for 2 years. 3. All Oriented Strand Board (OSB) is warranted for 2 years 4.