12x8 Metropolitan Instructions

23
2" (5,1 cm)
PARTSREQUIRED(TEMPORARY):
DOOR
First, nail lower edge of panel to  oor frame using 2" nails 6" apart.
Angle nail to hit  oor frame (Fig.B).
3
You have  nished standing your FRONT WALL.
FINISH
5
Secure front wall bottom plates to  oor using (8) 3" nails (Fig.B).
4
3" (7,6 cm)
x8
3" (7,6 cm)
x4
x14
FRONT WALL INSTALLATION
BOAx2
3"Nailsintobottomplate.
3"(7,6cm)
Screwsx4
LEVEL
BEGIN
Stand front wall on  oor.
Center front wall assembly on the 144" front  oor dimension.
Use (2)
BOA as temporary braces. Level wall and secure
BOA with two 3" screws.
2
1
144"
(365,8 cm)
Nail2"nailsrst.
2"(5,1cm)
Nails
3"(7,6cm)
Nails
Fig.B
2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm)
x2
BOA
Fig.A