12x8 Metropolitan Instructions

66
•Followdirectionsprovidedbymanufacturerandtheseinstructions.
SHINGLES
- NOT INCLUDED -
NEVERDRIVEFASTENERSINTOORABOVESEALINGSTRIPS.
Familiarizeyourselfwitha3-TabShingle.
SHINGLE NAIL PATTERN
1"
(2,5 cm)
NAILS
Sealing Strip
1"
(2,5 cm)
1/2"
(1,3 cm)
Full Rain Slot
Half A Rain Slot
Notch
Notch
Install rst starter row upside down, color up and ush to drip edge at bottom of roof panel. Use (4) nails per shingle.
Starterrowmustbestraightandlevelallthewayacrosswithloweredgeofroofdeck.
Begin where indicated on image below, install rst row of shingles with notch ush with drip edge.
2
2
DripEdge
Notch
BACKOFSHED
STARTHERE
BACKOFSHED
TABSUP
BEGIN
Shingle overlaps
roofdecking.
(4)Nails
Flushtodripedge.
Flushwithstarterrow.
1"(2,5cm)
Flushtodripedge.
DOOR
DOOR
BEGIN
¸
1