12x8 Metropolitan Instructions

67
Continue installing rows of
shingles by staggering at front.
Install second row of shingles ush at top of rst row's rain slots. Ensure ush to drip edge at front side,
stagger each row.
Continue installing rows of shingles to the front of the shed. At the front edge of the shed make sure there is a
maximum of 5" or less to the rain slot, as shown below. If shingles overlap at front roof edge cut to roof edge with a
utility knife.
1"
(2,5 cm)
5"
(12,7 cm)
5"
(12,7 cm)
or less.
BACKOFSHED
Flushwithrainslots.
Notch
Notch
Using your shingle hooked blade carefully cut shingles along chalk line.
3
5
4
6
SHINGLES
continued...
•Ifmorethan5"torainslotyoumustinstallanotherrowofshingles.
BACKOFSHED
Flushwithrainslots.
Topofrainslot.
CutOff.
Cut
DOOR