12x8 Metropolitan Instructions
67
Continue installing rows of
shingles by staggering at front.
Install second row of shingles ush at top of rst row's rain slots. Ensure ush to drip edge at front side,
stagger each row.
Continue installing rows of shingles to the front of the shed. At the front edge of the shed make sure there is a
maximum of 5" or less to the rain slot, as shown below. If shingles overlap at front roof edge cut to roof edge with a
utility knife.
1"
(2,5 cm)
5"
(12,7 cm)
5"
(12,7 cm)
or less.
BACKOFSHED
Flushwithrainslots.
Notch
Notch
Using your shingle hooked blade carefully cut shingles along chalk line.
3
5
4
6
SHINGLES
continued...
•Ifmorethan5"torainslotyoumustinstallanotherrowofshingles.
BACKOFSHED
Flushwithrainslots.
Topofrainslot.
CutOff.
Cut
DOOR