6695 STOP! ¡PARADA! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 1-800-577-9663 or email: customerservice@backyardproductsllc.com Our staff is ready to provide assistance.
Revision: 2-3-09 Customer Service 1-800-577-9663 1000 Ternes Drive Monroe, MI 48162 10’ and 12’ Round Gazebo - BEFORE YOU BEGIN - - TREATING YOUR GAZEBO - Always wear OSHA-APPROVED safety glasses throughout assembly process Staining... This Gazebo is constructed of a long-lasting western cedar. Untreated cedar exposed to sunlight will eventually weather to a silver-grey color. To validate your warranty and to help keep the original red color, read your warranty page on maintaining your Gazebo.
10’ and 12’ Round Gazebo 8-Sided 10-Sided ■ Parts List San Marino 10’ ❑ 7 pcs. Pre-assembled Wall Panels 44-3/4” x 82-1/2” ❑ 1 pc. Pre-assembled Door Panel 44-3/4” x 82-1/2” with Spacer ❑ 1 pc. Roof Finial ❑ 1 pc. Ridge Block 8-Sided ❑ 1 pc. Metal Roof Cap ❑ 8 pcs. Plywood Triangular Roof Panels ❑ 8 pcs. Rafters 2 x 4 x 62-3/4” ❑ 8 pcs. Plywood Gusset Brackets ❑ 7 pcs. Sill Plates Notched 2 x 4 x 40-1/4” ❑ 8 pcs. Plywood Fascia 5/8” x 3-1/2” x 46-7/8” ❑ 8 pcs.
1 F loor S ystem (Floor systems not supplied with kit) Y ou must build your G azebo on a floor system . Site Preparation • Site must be properly leveled. • Site should have natural drainage to eliminate puddling under and around the building. • Site should be covered with plastic film to discourage grass growth under the building and to serve as a vapor barrier. Before assembling your gazebo, you must first construct a floor system. You can: A. Purchase our optional pre-cut Floor Kit. B.
1 W ood F loor S ite P reparation For optional pre-cut floor kit, follow assembly instructions included with floor kit. It is important to have a solid, flat and level foundation for your Gazebo. Carefully consider the recommendations listed below prior to creating your foundation. LEVEL GROUND INSTALLATION Remove dirt to allow for Floor Frame. Shim outside of frame corners as needed. Follow local codes for anchoring requirement or see local home center for recommendation.
1 C oncrete S lab S ite P reparation It is important to have a solid, flat and level foundation for your Gazebo. Carefully consider the recommendations listed below prior to creating your foundation. Fig.1 CONCRETE SLAB OR HARD SURFACE INSTALLATION Concrete Slab Dimensions 111" Flat to Flat Measurements given on the Fig. 1 Concrete Slab Dimensions illustration are 1-1/2” larger than the outside dimensions of the Gazebo. You may choose to make your concrete slab larger than the dimensions given.
2 ASSEMBLING wall panels PARTS LIST 10’ GAZEBO ❑ 7 pcs. Pre-assembled Wall Panels ❑ 1 pc. Pre-assembled Door Panels PARTS LIST 12’ GAZEBO ❑ 9 pcs. Pre-assembled Wall Panels ❑ 1 pc. Pre-assembled Door Panels 2-A: Select desired Door location and position Wall Panels on ground around foundation as shown in Fig. 2-A. 2-A If you are constructing the 12’ Gazebo, please allow for two additional wall sections when laying out your walls. NOTE: Wall Panels have beveled edges.
3 PARTS LIST 10’ GAZEBO I nstalling gusset brackets ❑ 8 pcs. Plywood Gusset Bracket PARTS LIST 12’ GAZEBO ❑ 10 pcs. Plywood Gusset Bracket VIEW FROM INSIDE Note: Use wood glue (not included) between Wall Panels and Gussets for added strength and to meet some local building codes. Temporarily install all gussets with 1-5/8” screws to align walls. Remove one gusset, apply glue, install all screws. Continue for all Gussets. Fig.1 FLUSH 3-A Gusset Bracket VIEW FROM OUTSIDE Fig.2 2-1/2" (6.
4 PARTS LIST 10’ GAZEBO Rafters 2 x 4 x 62-3/4” R after and ridge ❑❑ 81 pcs. pc. Ridge Block-8 Sided block assembly PARTS LIST 12’ GAZEBO 2 x 6 x 78-3/8” and erecting raf -❑❑ 101 pc.pcs. Rafters Ridge Block - 10 Sided ❑ 2 pc. Ridge Cover-10 Sided ters If you are assembling a 12’ Gazebo, please begin with step 4-B, if you are assembling a 10’ Gazebo, please go to step 4-A.
4 R after and ridge block assembly continued 4-C VIEW FROM BOTTOM VIEW FROM TOP Fig.2 Fig.1 (2) 3"Screws at slight angle Centered over corner of Gusset Bracket 4-C: Carefully lift the Rafter and Ridge Block assembly on top of the Gusset Brackets at opposite corners of the Gazebo. Place Rafter Ends at center of outside corner of Gusset Bracket as shown in Fig. 1.
4 A ssembling and erecting rafters continued 4-D 4-D: Install remaining Rafters by inserting screws through Gusset Bracket, as shown in 4-C Fig. 2, while holding Rafter in position. Install 3” screw through top of Rafter or Ridge Block as shown in 4-A or 4-B top view. Once all Rafters are in place, install 3” screws in underside of Ridge Block into Rafters as shown in 4-A or 4-B bottom view.
4 A ssembling and erect ing rafters continued for 1 2 ’ only 4-E: For 12’ Gazebo Only For 12’ Gazebo, attach Ridge Cap to top of Ridge Block with four 1-5/8” screws as in Fig.1. Fig.1 (4) 1-5/8" Screws into each Ridge Cap after Rafters are installed 12' GAZEBO TOP VIEW 12' Gazebo Ridge Block For 12’ Gazebos, install bottom Ridge Cap cover with (4) 1-5/8” Screws and shown in Fig.2. Fig.
5 A nchoring gazebo PARTS LIST 10’ GAZEBO ❑ 1 pc. Assembled Side Wall and Rafters ❑ 8 pcs. Metal “L” Brackets and Screws (Not included in Kit) PARTS LIST 12’ GAZEBO ❑ 1 pc. Assembled Side Wall and Rafters ❑ 10 pcs. Metal “L” Brackets and Screws (Not included in Kit) 5-A: ANCHORING ON WOOD FLOOR OR WOOD DECK Anchor to wood floor by predrilling holes and installing two 3” screws at an angle through corner post into wood floor as shown in Fig. 1.
5 A nchoring gazebo CONTINUED PARTS LIST ❑ Assembled Side Wall and Rafters ❑ Anchor or Brackets and Screws (Not included in Kit) Check with our local Building Code Department for any variances. 5-B VIEW FROM INSIDE Optional Bolts 1/2"x3" Optional Anchor Screws Fig.2 Optional Anchoring of Gazebo Fig.
6 I nstalling roof panels F or 1 0 ’ & 1 2 ’ G azebo NOTE: Make certain the rough cedar sawn side of each Roof Panel is facing down during assembly. PARTS LIST 10’ GAZEBO ❑ 8 pcs. Plywood Triangular Roof Panels PARTS LIST 12’ GAZEBO ❑ 10 pcs. Plywood Triangular Roof Panels 2" Nail Center Panels on or in between 3/4" Marks 3/4" Marks Fig.1 3/4" 6-A Fig.
6 I nstalling roof panels continued 6-B 5 4 6 3 7 8 2 1 2 2" Nails every 8" once all Roof Panels are in place 6-B: Follow the same steps as in 6-A to install all remaining Roof Panels, only temporarily nailing in place. Once all Roof Panels are in place and fit properly on your Gazebo, then nail every 8” with 2” nails.
7 I nstalling F ascia Rafter End Fig.1 Rough sawn Cedar side 3/4" Mark PARTS LIST 10’ GAZEBO ❑ 8 pcs. Fascia 5/8” x 3-1/2” x 46-7/8” Plywood ❑ 8 pcs. Fascia Trim 3/8” x 1-1/2” x 3-3/4” PARTS LIST 12’ GAZEBO ❑ 10 pcs. Fascia 5/8” x 3-1/2” x 46-3/8” Plywood ❑ 10 pcs. Fascia Trim 3/8” x 1-1/2” x 3-3/4” 7-A: Place a mark 3/4” in on end of Rafter as shown in Fig. 1. Center Fascia on Wall Panels in between corners and 3/4” marks and butt Fascia to bottom of Roof Panels.
Note: If installing a Screen Kit, skip Step 8 and refer to Screen Kit instruction manual before going to Step 9. 8 PARTS LIST 10’ GAZEBO I nstalling SILL PLATE ❑ 7 pcs. Sill Plates PARTS LIST 12’ GAZEBO 2 x 4 x 40-1/4” ❑ 9 pcs. Sill Plates ❑ 18 pcs.Corbels 2 x 4 x 40-1/4” 2 x 4 x 14” 8-A: Install Window Sill Plates with ears projecting to the inside of the Gazebo. Attach with (2) 3” screws and (2) 2-1/2” screws as shown in 8-A.
10 ❑ 5 Bundles ❑ 7 Bundles ❑ 40 feet ❑ 50 feet ❑ 1 Pc. ❑ 1 Pc. I nstalling D rip edge , shingles , M etal C ap and spindle 10-A Caulking the Roof Seams before shingling will improve the water resistance of your Gazebo.
Limited Conditional Warranty* Backyard Storage Solutions, LLC warrants the following: 1. Every product is warranted from defects in workmanship and manufacturing for one year. 2. All hardware and metal components are warranted for two years. 3. Trim is warranted for 10 years. 4. Waferboard siding and sheathing is warranted for two years. 5. SmartSide™ siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings. 6.