User Guide

©20022011M.S.CHOHAN.Duplicationinwholeorinpartisprohibited. Page4of6

PREASSEMBLYOFMAINDUCT
1. Determineiftheductistobeextendedtotherightof
theunitortotheleft. Installtheendcapontheside
opposing the extension. See figure below. If desired
theendcapmaybesealedwithpartofthefoamtape
providedwiththekit.This
isrecommendedtoreduce
possibleleakage.
2. SETAIRDISTRIBUTION:Theduct isfactorypresetfor
80% main room and 20% adjacent room air
distribution. Install the Volume Baffle provided for a
60/40airdistribution.
3. To install the Volume Baffle, position the baffle
through the open end ofthe Main Duct(1) andalign
with holes in top of duct. Install two of the provided
No.8screwsthroughtheholesandintothebaffle(2)
INSTALLATIONOFMAINDUCTKIT
1. Place the Main Duct atop the Mounting Brackets as
shown below (1). Install 4 No.8 screws to secure the
duct to the Mounting Brackets (2). Do not fully
tighten.
2. IMPORTANT! See figure below for duct position on
brackets. Shift right or left based on your installation
andfinaltightenthescrewsonbottom.
3. ReinstallthePTACchassisandfrontcover.
NOTE: Access to the control panel and view of the
controlswillberestrictedoncethemainduct is installed.
The cover will not open fully or stay open by itself. It is
suggestedthat a remote wired orwirelessthermostat be
usedforconvenience.