Quick Start Manual

INSTALLATION CHECK LIST
REFER TO INSTALLATION INSTRUCTIONS
GAS SUPPLY
Adequate pipe size
C
orrect supply pressure (during furnace operation)
Manifold pressure
No gas leaks
L.P. Kit Number (if applicable)
ELECTRICAL
115 V.A.C. supply (Single Circuit)
Polarity observed
Furnace properly grounded
Adequate wire size
FURNACE INSTALLATION
Adequate clearance to combustibles
Adequate clearance for service (at front)
DUCT STATIC PRESSURE
in. w.c. on heating speed
in. w.c. on cooling speed
Air temperature rise
CONDENSATE LINE
Trap filled with water
Vented
Sloped toward drain
Condensate drain line hoses connected
and clamped
Freeze protection (if necessary)
VENTING DIRECT VENT
in. diameter intake pipe
in. diameter exhaust pipe
ft. of pipe intake air
no. of elbows intake air
ft. of pipe exhaust pipe
no. of elbows exhaust pipe
Exhaust vent temp.
TERMINATIONS DIRECT VENT
VERTICAL
I
ntake 12" min. above roof/snow level
Correct relationship exhaust to intake
HORIZONTAL/VERTICAL CONCENTRIC (RXGY-E03A)
Intake 12" min. above roof/snow level
Intake “Y” rotated above center
Exhaust sloped toward furnace
HORIZONTAL STANDARD (RXGY-D02, -D02A, -D03,
D03A)
Correct relationship exhaust to intake
12" min. above grade/snow level
HORIZONTAL ALTERNATE (RXGY-D02, -D02A, -D03, -
D03A)
Correct relationship exhaust to intake
Above anticipated snow level
VENTING NON-DIRECT VENT
in. diameter exhaust pipe
ft. of pipe exhaust
no. of elbows
TERMINATION NON-DIRECT VENT
VERTICAL
12" min. above roof/snow level
HORIZONTAL STANDARD
12" min. above grade/snow level
HORIZONTAL ALTERNATE
Above anticipated snow level
Model Number
Serial #
Date of Installation
2