User Guide

Settfemont
of
Outdoor
Unit
-
"
Anchor
the
outdoor
unit
with
a
bolt
and
nut
(e10mm)
tightly
and
horizontally
on
a
concrete
or
rigid
mount.
"
When
installing
on
the
wall,
roof
or
rooftop,
anchor
the
mounting
base
securely
with
a
nail
or
wire
assuming
the
influence
of
wind
and
earthquake.
"
in
the
case
when
the
vibration
of
the
unit
is
conveyed
to
the
house,
settle
the
unit
with
an
anti-vibration
rubber.
Evaluation
of
the_performance
Bolt
i.
i
Tubing
connection
Operate
unit
for
15-20
minutes,
then
check
the
system
refrigerant
charge:
(1)
Measure
the
pressure
of
the
gas
side
service
valve.
(2)
Measure
the
outside
ambient
airtemperature.
(3)
For
reference;
the
gas
side
pressure
of
optimum
condition
is
as
Below;
Outside
ambient
TEMP.
The
Pressure
of
the
gas
side
service
valve
35-C(95°F)
4-Skg/om2(56.8-71.0
P.S.I.G)
NOTE
If
the
actual
pressure
are
higher
than
shown,
the
system
is
most
likely
over-charged,
and
charge
should
be
removed.
If
the
actual
pressure
are
lower
than
shown,
the
system
is
most
likely
undercharged,
and
charge
should
be
added.
The
air
conditioner
is
now
ready
for
actual
operation.
Temperature,
Pressure,
Ampere
Chan-
.
_
__._
_
;
---
D'echarge
Air
Ten"rature.
T
WX
pressure,
PSJ.e
-----
Rated
Load
Cwrwd,
A
0
155
1
14
127
99
99
85
71
57
43
59
i7
2
.
d
i5
.
0.8
so
ta.2
is.4
10
9
s
7
-
s
s
4
_
1
n
N
a
N
m
3
0
v"
m:
3
m
8
m
t]
19.8
73.4
T7
Safi
84.2
979
91.4
95
Safi
1022
105.8
1M4
113(
°r)
(Outdoor
Terrp.)
-40-