INSTALLATION / PERFORMANCE CHECK LIST
ELECTRICAL SYSTEM:
Electrical connections tight? YES NO
Line voltage polarity correct? YES NO
Rated Voltage: ___________________________________ VOLTS
L1-L2 Volts: _____________________________________ VOLTS
L1-L3 Volts: _____________________________________ VOLTS
L2-L3 Volts: _____________________________________ VOLTS
Avg. Volts: ______________________________________ VOLTS
Max. deviation of voltage
from avg. volts: ___________________________________ VOLTS
% Volt imbalance: ________________________________ VOLTS
Blower Motor HP: ________ Sheave Setting ___________# Turns
Has the thermostat been calibrated? YES NO
Is the thermostat level? YES NO
Is the heat anticipator setting correct?
(If Applicable)
YES NO
7094780 (NEW)
INSTALLATION ADDRESS:
CITY ________________________ S TAT E ________________
UNIT MODEL # ________________________________________
UNIT SERIAL # _______________________________________
Unit Installed Minimum clearances per
Figure 1 (page 3)?
YES NO
INSTALLER NAME:
CITY _______________________ S TAT E ________________
REFRIGERATION SYSTEM:
Was unit given 24 hr warm up period
for crankcase heaters?
YES NO
Stage-1 Liquid Pressure (high side) ________________________
Stage-1 Suction Pressure (low side) ________________________
Has the owner’s information been
reviewed with the customer?
YES NO
Has the Literature Package been left
with the unit?
YES NO
REPLACEMENT PARTS
Replacement parts are available through your distributor. Please
have the complete model and serial number of the unit when
ordering replacement parts.
Electrical:
Capacitors Temperature Limit Switches
Compressors Thermostats
Contactors Time Delay Relays
Pressure Switches Transformers
Relays
Motors:
Blower Motor
Fan Motor
Components:
Blower Assembly Fan Grille
Cabinet Panels Filter/Driers
Expansion Valves
Specifications & illustrations subject to change without notice or incurring obligations.
Jackson, MI | Printed in U.S.A. (09/12)