Air Conditioner User Manual

Heatilator • GDST3831I • 2127-900 Rev. K • 7/1226
General Rules:
SUBTRACT 3 ft. from the total H measurement for each
90° elbow installed horizontally.
SUBTRACT 1-1/2 ft. from the total H measurement for
each 45° elbow installed horizontally.
A maximum of three 90° elbows (or six 45° elbows) may
be used in any vent con guration. Some elbows may be
installed horizontally. See Figure 7.6.
Elbows may be placed back to back anywhere in the
system as long as the rst 90° elbow is a starter elbow.
When penetrating a combustible wall, a wall shield
restop must be installed.
When penetrating a combustible ceiling, a ceiling restop
must be installed.
• Horizontal runs of vent do not require vertical rise;
horizontal runs may be level.
F. Vent Diagrams
H
1
V
1
Figure 7.4
One Elbow
1. Top Vent - Horizontal Termination
V
1
Minimum** H
1
Maximum
90 Elbow** 2 ft. 610 mm
1/2 ft.** 152 mm 2 ft. 610 mm
1-1/2 ft.** 457 mm 3 ft. 914 mm
2-1/2 ft.** 762 mm 5 ft. 1.5 m
3-1/2 ft. 1.1 m 7 ft. 2.1 m
4-1/2 ft. 1.4 m 14 ft. 4.3 m
H
1
Max. =14 ft. (4.3 m)
V + H Max. = 40 ft. (12.2 m)
See Warning**
WARNING**
Note: There MUST be a 25%
reduction in total H when using
ex vent except when using the
simple up and out installation
(see Figure 7.3).
Fire Risk.
When using SLP-HRC-SS and SLP-HRC-ZC-SS
termination caps on top vented replaces, a one
foot minimum vertical vent section is required before
installing rst elbow
.
When using DVP-TB1 termination cap on top vented
replaces, a three foot minimum vertical vent section
is required before installing rst elbow.
When using any other cap, a section of vertical pipe (12 inches
minimum) MUST be installed prior to attaching a 90° elbow.