Manual

CLEARANCE/ HEIGHT REQUIREMENTS cont
Figure 7.
Measuring heat resistant material for mantel.
Heat resistant material ( minimum requirements) with
wooden mantel or other combustible projection:
To install the heater with a wooden mantel, shelf or
other combustible projection above, first measure
the heat resistant material shown in Figure 7.
12” or more Hood not required. Observe profiles
(side elevations) shown in Figure 3.
Hood not required. Observe profiles
(side elevations) shown in Figure 5.
8” to less than 12” Install hood and observe profiles
shown in Figure 4. Or extend heat
resistant material to at least 12”
observe profiles shown in Figure 3.
Install hood and observe profiles
shown in Figure 4. Or extend heat
resistant material to at least 12”
observe profiles shown in Figure 5.
Less than 8” Extend heat resistant material to at
least 8” . Install hood and observe
profiles shown in Figure 4. Or
extend heat resistant material to at
least 12” and observe profiles shown
in Figure 3.
Extend heat resistant material to at
least 8” . Install hood and observe
profiles shown in Figure 4. Or
extend heat resistant material to at
least 12” and observe profiles shown
in Figure 3.
FLOOR CLEARANCE
This gas log heater must be installed at least 5” above any combustible flooring material, such as
carpeting or tile, which is closer than 14” to the base of the fireplace. This minimum distance must be
maintained from the top surface of carpeting, tile, etc. Refer to Figure 8.
8" or more of
heat resistant
material
8” or more of heat
resistant material
Heater in Fireplace
or Firebox
5" Minimum
14" Minimum
Figure 8.
Minimum
clearance above
combustible
flooring.
Figure 9.
Minimum
clearance above
combustible
flooring with
non-combustible
material installed
at base of fireplace.
This gas log heater may be installed nearer to the floor if a minimum of 14” of noncombustible material
such as slate or marble is installed between the base of the fireplace and the combustible flooring.
Refer to Figure 9.
Page 7
Combustible
material
5” Minimum
14” Minimum
Heat Resistant Material Requirements for safe installation with wooden mantel, shelf
measurement or other combustible projection.
Combustible
material