Operation Manual

388
5.8 Time Calculation, Synchronous Point Analysis
Synchronous point analysis
The synchronous point analysis shows the chronological history of
machining and the interdependency of the slides. This helps you to
organize and optimize a multi-channel program. Information in the
synchronous point analysis:
Machining times/idle times
Waiting times
Tool change
Synchronous points
Synchronous point information:
The NC block relevant for the selected synchronous point
tw: Waiting time at this synchronous point
tg: Calculated execution time as of program start
Evaluating the synchronous point analysis: Place the cursor (arrow
beneath the bar diagram) on the event to be analyzed in order to obtain
the following synchronous point information:
NC program/subprogram
Type of event (tool change or synchronous point)
Slide involved
Active tool
NC block number
tw: Waiting time at this synchronous point
tg: Calculated execution time as of program start
Calling the synchronous point analysis
U Select “Set up > Times”
U Press the soft key
Selecting the next/previous synchronous point:
U Right/left arrow
Change slides:
U Press the soft key or PgUp/PgDn
Return to time calculation:
U Press the soft key again
Return to simulation:
U ESC key