Sear Burner Conversion Kit Guide

©2017 Hestan Commercial Corporation
4
EN
CHANGING ORIFICES (LP UNITS ONLY)
(continued)
3. The new LP orifice was supplied with this kit - the orifice size is stamped on the body of the orifice.
If necessary, consult the chart at the end of this manual for what size is used on each burner type.
This is also a good time to clean and inspect the burners for clogged ports, debris, spider webs, etc.
Install the orifice slowly to avoid cross-threading and damaging the threads. The orifice will become
noticeably harder to turn as you proceed. Make frequent visual checks of the orifice as it goes
onto the valve. As shown below, the orifice is nearly bottomed-out on the valve body. You want to
tighten all the orifices equally so they are all seated the same distance. Use a burner to check the
orifice is properly seated. As shown, the burner should fully seat with the orifice protruding into
the air shutter as far as possible. The burner should rest flat on the burner hanger at the back of the
firebox.
SEAR BURNER INSTALLATION
1. Before installation, remove the mesh screen and metal cover on the Sear Burner. This will make
installation easier.
METAL
COVER
MESH
SCREEN
SCREW HOLE
IN REAR BRACKET