Installation Instructions

©2021 Hestan Commercial Corporation
2
CABINET DOOR INSTALLATION
(continued)
2. Consult the table at the end of this instruction manual to determine the appropriate cutout dimensions
for the Aspire Outdoor cabinet product you are installing. The cutouts should be square at all corners
for proper fitment of the cabinet. The installer will have to build up any internal structural elements or
supports in the island in order to secure the cabinet in place. Stainless steel hardware (not included) is
highly recommended.
3. Slide the frame into the opening and check for proper alignment (AEAD36 shown). Secure the frame
to the structural members of your island using the various available mounting holes in the frame. Use
at least 2 screws per side. Shim between the frame and opening as needed to avoid distorting the frame
when securing the screws.
4. To re-install the door, follow the instructions shown below.
ACCESS
DOOR
FRAME
ATTACH AT THIS
NOTCH FIRST
DOOR
STRUCTURE
(DOOR JAMB)
MOUNTING
BASE
PUSH HINGE
UNTIL REAR
CLIP ENGAGES