Installation Guide

©2017 Hestan Commercial Corporation
11
EN
INSTALL OUTER PANELS
9. The GFCI outlet on the right side of the suite is shipped loosely and must be passed through the
space shown below and installed from behind the right panel (does not apply to Suite with a bar).
Line up and install 4 each #10
screws as shown here.
Install the foam gasket, and
weather-proof cover with the
screws provided.