Installation Guide

©2017 Hestan Commercial Corporation
14
EN
INSTALL SUPPORT STRUCTURE AND TOP
The Hestan Outdoor Living Suite DOES NOT include the stone countertop and plywood sub-
structure. Template drawings are provided at the end of this manual with RECOMMENDED final
stone dimensions. The stone installer will typically come out a few days prior to installation to
go over the dimensions and make a physical template of the top before cutting the slab you have
chosen. The stone countertop is supported beneath with a 3/4 inch thick plywood base (see below).
Due to the outdoor application of this product, pressure-treated plywood is recommended prior to
laying down the stone. Be sure to arrange for this plywood to be provided with the stone countertop
at the time of installation.
14. Before installing the top, you should now go back and tighten all bolts everywhere else in the suite.
Install the plywood sub-structure first. Get assistance from another person to help lift the plywood
and position correctly. (8 foot Outdoor Living Suite shown)
STONE
PLYWOOD
YOUR STONE INSTALLER WILL COMPLETE THE ASSEMBLY OF THE SUITE COUNTERTOP.
YOU MAY THEN INSTALL THE APPLIANCES, CABINETS, AND OTHER PRODUCTS AS PER
THE INSTRUCTION MANUALS SUPPLIED WITH THOSE PRODUCTS.
Use coated or stainless steel 1/2”
long wood screws where needed to
attach the plywood to the vertical
walls in the small holes provided.