Installation Manual

B. CABINET INSTALLATION: Place the oven
adjacent to the wall or cabinet opening. Plug the
power cord into the electrical outlet. Carefully
guide the assembled oven into the prepared
opening. Slide the oven on the Bottom Duct
assembly. See Figure 9.
Figure 9
C. CABINET INSTALLATION: Avoid pinching the
cord between the oven and the wall. Adjust the
position of the oven so that the feet of the oven
are fitted into the holes of the Bottom Duct
Assembly. See Figure 10.
DUCT RECESS
BOTTOM DUCT
ASSEMBLY
FOOT
Figure 10
A. BOTTOM DUCT ASSEMBLY: Place the Bottom
duct in the center of the opening so that gap
"A" is equal to gap "B". When the Bottom Duct
assembly is positioned properly, the front edge
of the duct will be flush with the front of the
cabinet. Secure with 2 SCREWS (H). See Figure 8.
Figure 8
BOTTOM
DUCT ASSEMBLY
SCREW (H)
GAP "A"
GAP "B"
DETAIL B
DETAIL A
NOTE:
Center Bottom Duct
Assembly in the opening
so that gaps A, B are equal.
STEP 3 SURFACE INSTALLATION
INSTALLATION INSTRUCTIONS
(CONT.)
©2019 Hestan Commercial Corporation
5
EN