Installation Manual

EN
©2018 Hestan Commercial Corporation
4
LOCATION AND INSTALLATION / VENTILATION
GAS
SUPPLY
TO
APPLIANCE
SHUTOFF VALVE
IN OPEN POSITION
The range is held onto the pallet with 4 large shipping bolts on both sides. Remove these bolts and
then move the range to the floor with the help of 2 persons.
PREPARATION
Before moving the range, protect any finished flooring and secure the oven door(s) closed to
prevent damage.
GAS AND ELECTRICAL SUPPLY CLEARANCES
If not already in place, install a gas shut-off valve in
an easily accessible location for servicing of the range.
Make sure all users of the range know where this shut-
off is located, and how to shut off the gas. Any openings
in the wall or floor behind the appliance must be sealed.
The Installation Clearances on the following pages show
where the “G” and “E” zones should be located.
The range is designed to be installed nearly flush to the
rear wall*. It may be necessary to reposition the gas
supply and power receptacle / junction box in order
to accommodate the range when pushed back against
the wall. The power supply cord when plugged in, or
junction box should protrude no more than 2-1/2” [6.4
cm] from the rear wall.
* Unless installed in an island with no rear wall.
CABINETRY
To eliminate the risk of burns or fire by reaching over heated surface units, cabinet storage space
located above the surface units should be avoided. If cabinet storage is to be provided, the risk can
be reduced by installing the required vent hood that projects horizontally a minimum of 5” [12.7
cm] beyond the bottom of the cabinets.