LEAK TESTING & ADJUSTMENT
(cont.)
Make certain new piping and connections have been made in a clean manner and have been purged
so that piping compound, chips, etc. will not clog regulators, valves, orifices, or burners.
IF THE INFORMATION BELOW IS NOT FOLLOWED EXACTLY, A FIRE OR EXPLOSION MAY IF THE INFORMATION BELOW IS NOT FOLLOWED EXACTLY, A FIRE OR EXPLOSION MAY
RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY, OR DEATH.RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY, OR DEATH.
LEAK TESTING TOP BURNERS
At this point, all conversion components should be installed and any hoses removed previously have
been returned and tightened. Before replacing the various sheetmetal parts, a complete leak check
must be performed on all gas-carrying components.
Begin by temporarily supporting
the single-flow center burner (if
equipped) with a small block of
wood as shown below.
Also temporarily return
all the burner rings
and caps to the other
burners.
(KRT365 shown)