Owners Guide

8. WIRING PREPARATION:
a) Install an appropriate 1/2” UL listed electrical wire clamp through the electrical strap(s) on
top of the hood deck.
b) Install electrical wiring from the service panel to the hood location for each blower assembly.
Consult the connection diagrams (previous pages) for further details on electrical placement.
See “ELECTRICAL SUPPLY AND GROUNDING” on page 1 for power requirements.
c) Support the hood beneath the location where it will hang and feed the electrical wire(s) into
the wire clamp(s). Tighten the wire clamp(s).
9. Raise the hood to its final position and attach it:
a) If mounting to the load-bearing framework in the ceiling, use appropriate hardware.
b) If mounting to a duct cover, use the screws previously removed in Step 3.
10. WIRING CONNECTION:
From inside the hood, using UL listed wire nuts, attach the “neutral” wire(s) to the white lead(s),
the “hot” wire(s) to the black lead(s), and the ground wire(s) to the green lead(s) inside the motor
box(es).
DO NOT OPERATE HOOD WITHOUT PROPER GROUND
CONNECTION.
11. Installing / connection to the blower deck:
a) Attach the transition to the blower deck assembly and seal with foil duct tape. The transition
must fit inside the exhaust collar on the blower deck assembly.
b) Reconnect the electrical connector(s). For assemblies with two connectors, connect the right
harness to the front connector and the left harness to the back connector.
c) While taking care to properly align the duct connection between the transition and the duct
in the ceiling, reinstall the blower deck assembly into the hood using the 12 screws previously
removed in Step 7.
12. Replace the blower housings and the blower shields. Make sure that the dampers open and close
smoothly.
13. Turn power ON, verify operation: See “USING THE VENTILATION SYSTEM” on page5 for
proper hood operation. Test all blower and light functions to ensure they are operating properly.
INSTALLATION
(CONT.)
©2020 Hestan Commercial Corporation
14
EN