User's Manual

Initial System Setup
Configuring the Seals
Tanker Truck Monitoring System- User’s Guide 20
7. Click-and-drag each seal to one of the check marked locations corresponding to where that
seal will be installed on the truck (section and valve or hatch). Repeat until all seals have
been dragged to their destined locations.
8. Click Config to record a map of all seals and their locations, in every seal in the installations.
As each seal is written, the corresponding message is displayed in the right window area. If
the configuration is successful, the message “Configuration Completed Successfully
appears.
NOTE: You may have to repeat the command by clicking Retry Config.