User's Manual

Installation
Truck Cabin Installation
Tanker Truck Monitoring System- User’s Guide 37
NOTE: The AVL Reader unit are fed from the vehicle supply. The supply should be connected
through a 2A fuse before the ignition switch; Use only provided Fuse + Fuseholder !
3. Power & Grounding connections:
Connect the power lines (J1) via the in-line fuse (2A) to the vehicle supply (24VDC).
Connect between AVL reader- J2/12pin and Protection Unit- J1
Ground the Protection unit (from its grounding wire only) to vehicle chassis.
Ground the AVL Reader (from its grounding stud only) to vehicle chassis.
4. Install the GPS – Cellular Module (LCU500) on the dashboard next to the windshield.
Connect communication cable between AVL reader- J1/10pin and LCU500- RJ/middle
connector( as shown below)
Connect the GSM antenna (either on the dashboard or on the side window)
Connect the cable power (J12) to vehicle supply (24VDC)
5. Position the AVL Reader external antenna as close as possible to the center of the cabin’s
roof and route the antenna cable toward AVL Reader.
GPS
Cellular Module
(LCU500)
Protection unit
A
VL Reader
Grounding Wire
(50cm)
Grounding Stud