Quick Start Guide
Table Of Contents
Thermometric Network Positioning System
·Quick Start Guide
1
1 Preparation
1.1 Basic Requirement
All the electronic operation should be strictly compliance with the electrical safety
regulations, fire prevention regulations and other related regulations in your local
region.
Check the package contents and make sure that the device in the package is in
good condition and all the assembly parts are included.
Use the system according to the working environment requirement.
1.2 Checking Installing Environment
Be sure that there is enough space to install the positioning system and
accessories.
Make sure that the wall is strong enough to withstand at least 8 times the weight
of the system and the mount.
1.3 Preparing Cables
According to the actual network bandwidth, the Cat5 (within 100M) or Cat6 (100M
above) is needed.
Choose the video cable according to the transmission length. The video should
meet the least demands as: 75Ω resistance; 100% copper core conducting wire;
95% weaving copper shield.
1.4 Preparing Tools
Before installation, please prepare the tools needed, such as the expansion screws,
electric hammer, electric drill, wrench, screwdriver, electroprobe and network
cable.
1.5 Original Packaging
When you unpack the positioning system, please keep the original package
properly, in case of returning or repairing the positioning system, you can pack the
positioning system with the package.
Note: The user should be responsible for any damage caused when transporting with
unoriginal package.










