User Manual

Table Of Contents
User Manual of Thermal Bi-spectrum Network PTZ Device
13
iris are in auto status during the pattern is being memorized.
Power Off Memory
The device supports the power off memory capability with the predefined resume time. It allows
the device to resume its previous position after power is restored.
Scheduled Task
A time task is a preconfigured action that can be performed automatically at a specific date and
time. The programmable actions include: auto scan, random scan, patrol 1-8 ,pattern 1-4, preset
1-8,frame scan, panorama scan, tilt scan, day, night, reboot, PT adjust, Aux Output, etc.
Park Action
This feature allows the device to start a predefined action automatically after a period of
inactivity.
3D Digital Noise Reduction
Comparing with the general 2D digital noise reduction, the 3D digital noise reduction function
processes the noise between two frames besides processing the noise in one frame. The noise
will be much less and the video will be clearer.