User Manual
Table Of Contents
- Legal Information
- Symbol Conventions
- Regulatory Information
- 1 Terminal and Wiring
- 2 Installation
- 3 Activation
- 4 Remote Configuration via Web
- 4.1 Live View
- 4.2 User Management
- 4.3 Number Settings
- 4.4 Device Management
- 4.5 Parameters Settings
- 5 Configuration via Client Software
- A. Communication Matrix and Device Command
6.
Drill 8 holes according to the marks on the wall, and insert the expansion sleeves
into the screw holes. The suggested size of hole is 6 (diameter) × 45 (depth) mm.
7.
Fix the gang boxes with 8 expansion bolts.
Figure 2-58 Fix the Gang Boxes
8.
Fill the gap between the gang box and wall with concrete. Remove the mounng
ears with tool aer concrete is dry. Route the grounding line through the cable
entries.
Figure 2-59 Remove the Mounng Ears
Note
The green-yellow line in the package is for grounding.
9.
Connect cables and insert the modules.
Module Door
Staon User Manual
48