User's Manual
Table Of Contents
- Legal Information
- Symbol Conventions
- Regulatory Information
- 1 Appearance
- 2 Terminal and Wiring
- 3 Installation
- 4 Activation
- 5 Configuration via Client Software
- 5.1 Device Management
- 5.2 Live View via Door Station
- 5.3 Remote Configuration
- 5.4 Organization Management
- 5.5 Person Management
- 6 Video Intercom Operation
- A. Communication Matrix and Device Command
1) Connect Cable 1 and one end of Cable 2 to the corresponding interfaces of
the Main Unit, then place the Main Unit into the upper grid of the le gang
box.
2) Connect the other end of Cable 2 to the input interface of Sub Module 1.
Connect one end of Cable 3 to the output interface of Sub Module 1 and
insert it into the middle grid of the le gang box.
3) Finish the wiring and inserng according to the cable number and the
posion shown as below.
Figure 3-60 Install Mounng Frame
The cables connect to each module shown as below.
Figure 3-61 Cables Connecon
Video Intercom Module Door
Staon User Manual
51