ICC ESR-1546 for HDA Undercut Anchors
Table Of Contents
ESR-1546
|
Most Widely Accepted and Trusted Page 7 of 16
TABLE 4A—REQUIRED HAMMER DRILLS FOR SETTING
Hilti hammer drill
bit connection type
M10 and M12 M16 M20
Tool Setting time Tool Setting time Tool Setting time
TE-C connection
(SDS Plus)
TE 25
1
10 – 20 sec.
(max. 60 sec.)
- - - -
TE 30-A
10 – 30 sec.
(max. 60 sec.)
TE 40
10 – 20 sec.
(max. 30 sec.)
TE-Y connection
(SDS Max)
TE 56
2,3
10 – 20 sec.
(max. 60 sec.)
TE 70
5
15 – 30 sec.
(max. 60 sec.)
TE 70
3
20 – 30 sec.
(max. 120 sec.)
TE 60
3,4
10 – 30 sec.
(max. 40 sec.)
TE 75
20 – 40 sec.
(max. 60 sec.)
TE 76
3
30 – 60 sec.
(max. 120 sec.)
- - TE 76
20 – 40 sec.
(max. 60 sec.)
TE 80
3
30 – 60 sec.
(max. 120 sec.)
- - TE 80
15 – 30 sec.
(max. 60 sec.)
- -
1
TE 25 first gear only.
2
TE 56: the impact energy range is only applicable for the specified setting tools. See Table 4B.
3
TE 56, TE 60, TE 70, TE 75, TE 76, TE 80 use max hammering power.
4
TE 60-A is not included.
5
Increase h
min
for the TE 70 with the HDA M16. See Table 3A and 3B.
TABLE 4B—REQUIRED STOP DRILL BIT AND SETTING TOOL
Anchor type Stop drill bit Setting tool
HDA-P(R) M10x100/20
TE-C-HDA-B 20x100
or TE-Y-HDA-B 20x100
TE-C-HDA-ST M10
or TE-Y-HDA-ST M10
HDA-T(R) M10x100/20
TE-C-HDA-B 20x120
or TE-Y-HDA-B 20x120
HDA-P(R) M12x125/30
TE-C-HDA-B 22x125
or TE-Y-HDA-B 22x125
TE-C-HDA-ST M12
or TE-Y-HDA-ST M12
HDA-P(R) M12x125/50
HDA-T(R) M12x125/30
TE-C-HDA-B 22x155
or TE-Y-HDA-B 22x155
HDA-T(R) M12x125/50
TE-C-HDA-B 22x175
or TE-Y-HDA-B 22x175
HDA-P(R) M16x190/40
TE-Y-HDA-B 30x190
TE-Y-HDA-ST M16
HDA-P(R) M16x190/60
HDA-T(R) M16x190/40 TE-Y-HDA-B 30x230
HDA-T(R) M16x190/60 TE-Y-HDA-B 30x250
HDA-P M20x250/50
TE-Y-HDA-B 37x250
TE-Y-HDA-ST M20
HDA-P M20x250/100
HDA-T M20x250/50 TE-Y-HDA-B 37x300
HDA-T M20x250/100 TE-Y-HDA-B 37x350