1. Turn all the leveling screws until they project approx. 5 mm underneath the vacuum base plate.
2. Connect the vacuum connector on the vacuum base plate to the vacuum pump.
3. Set the drill stand on the vacuum base plate.
4. Use the screw supplied, complete with its washer, to secure the drill stand to the vacuum base plate.
5. Locate the center point of the hole to be drilled.
6. Draw a line approximately 800 mm in the direction in which the core drilling system is to stand.
7. At a distance of 165 mm (6 1/2 inches) from the center point of the hole to be drilled, make a mark on the
800 mm long line.
8. Switch on the vacuum pump and press and hold down the vacuum release valve.
9. Position the drill stand on the work surface.
10. Release the vacuum release valve.
11. Use the leveling screws to level the vacuum base plate.
The needle of the pressure gauge is in the green area.
Note
Do not level the anchor base plate on the vacuum plate.
12. Secure the drill stand for drilling horizontally.
13. Check that the drill stand is secure.
5.1.5 Adjusting the drilling angle when using the drill stand with combination base plate
WARNING
Risk of injury Risk of crushing the fingers in the articulation.
Wear protective gloves.