Installation Typicals - Fastening on Steel Threaded Studs
2 studs
4 studs
DOWNLOAD DRAWINGS (PDF) DOWNLOAD DRAWINGS (DWG) FASTENER OVERVIEWFASTENER SYSTEM
APPLICATION OVERVIEW
DISCLAIMERHOW TO USE THIS DOCUMENT
x
x
Application
• Fastening of cable trays, pipes on a T-Post support, which is fastened on a
horizontal structure
• Support is fastened by two / four X-BT-MR (horizontal distance x)
• L1 is the total width of the T-Post, L2 is fix set to 1000 mm
• Load F is the acceptable total load (all dead load including)
Boundary conditions
• These values are ONLY reflecting capacity of X-BT-MR threaded stud.
Structural analysis of support / structure is NOT in Hilti scope. See the detailed
statements in disclaimer — 2018/05/04
• 2 Load cases: load asymmetric acting in the center of one arm only,
30% acting as horizontal load
FASTENER TECHNICAL DETAILS
Result:
L1 [mm]
F [kg]
50 75 100 125 150 200 250 300
→ Load in [kN] 0.49 0.74 0.98 1.23 1.47 1.96 2.45 2.94
x
[mm]
80
4855 3290
100
6070 4110 3135
125
7585 5140 3915 3185 2695
150
9105 6170 4700 3820 3235
175
10625 7200 5485 4460 3775 2915
200
12140 8225 6270 5095 4310 3335
Result:
Load
F [kg]
L1 [m m]
150 200 250 400 600 800 1000 1200
x
[mm]
80
195 195 195 195 195 195 195 195
100
240 240 240 240 240 240 240 240
125
305 305 305 305 305 305 305 305
150
365 365 365 365 365 365 365 365
175
425 425 425 425 425 425 425 425
200
485 485 485 485 485 485 485 485
Result:
Load
F [kg]
L1 [m m]
150 200 250 400 600 800 1000 1200
x
[mm]
80
95 95 95 95 95 95 95 95
100
120 120 120 120 120 120 120 120
125
150 150 150 150 150 150 150 150
150
180 180 180 180 180 180 180 180
175
210 210 210 210 210 210 210 210
200
240 240 240 240 240 240 240 240
Result:
L1 [mm]
F [kg]
50 75 100 125 150 200 250 300
→ Load in [kN] 0.49 0.74 0.98 1.23 1.47 1.96 2.45 2.94
x
[mm]
80
2505 1725
100
3135 2155 1665
125
3915 2695 2080 1715 1470
150
4700 3235 2500 2060 1765
175
5485 3775 2915 2405 2060 1630
200
6270 4310 3335 2745 2355 1865
NOTE: load capacity used for calculation N
rec
= 3.6 kN (axial) / V
rec
= 4.3 kN (shear)
Technical assessment — maximum of L1 and F (depending on load F or lever arm length L1 and X-BT-MR distance x)
FASTENING T-POST (FLOOR) SUPPORT
WITH X-BT-MR*
Two / Four X-BT-MR Threaded studs
X-BT-MR • Metric
*X-BT-MR is the new generation X-BT
20Issued August 2018, expiry January 2022