Installation Typicals - Fastening on Steel Threaded Studs

DOWNLOAD DRAWINGS (PDF) DOWNLOAD DRAWINGS (DWG) FASTENER OVERVIEW
APPLICATION OVERVIEW
DISCLAIMERHOW TO USE THIS DOCUMENT
x
x
2 studs
4 studs
FASTENER SYSTEM
FASTENER TECHNICAL DETAILS
Application
Fastening of cable trays, pipes on a L-Post support, which is fastened on a
horizontal structure
Support is fastened by two / four X-BT-MF (horizontal distance x)
L1 is the distance of the load center to the vertical structure surface
Load F is the acceptable total load (all dead load including)
Boundary conditions
These values are ONLY reflecting capacity of X-BT-MF threaded stud.
Structural analysis of support / structure is NOT in Hilti scope. See the detailed
statements in disclaimer 2018/05/04
Load F acting at the distance of L1 from structure surface
Result:
L1 [mm]
F [kg]
50 75 100 125 150 200 250 300
→ Load in [kN] 0.49 0.74 0.98 1.23 1.47 1.96 2.45 2.94
x
[mm]
80
200 120 80 55 40 20 5
100
255 150 100 70 50 25 10
125
315 190 125 90 60 30 10
150
380 230 150 105 75 35 15
175
445 265 180 125 90 45 15
200
510 305 205 140 100 50 20
Result:
L1 [mm]
F [kg]
50 75 100 125 150 200 250 300
→ Load in [kN] 0.49 0.74 0.98 1.23 1.47 1.96 2.45 2.94
x
[mm]
80
445 285 200 155 120 80 55 40
100
560 355 255 190 150 100 70 50
125
700 445 315 240 190 125 90 60
150
840 535 380 290 230 150 105 75
175
980 625 445 340 265 180 125 90
200
1120 715 510 385 305 205 140 100
Result:
Load
F [kg]
L1 [m m]
150 200 250 400 600 800 1000 1200
x
[mm]
80
60 50 40 25 15 10 10 5
100
75 60 50 30 20 15 10 10
125
85 70 60 40 25 20 15 15
150
100 80 70 45 30 25 20 15
175
110 90 75 50 35 30 20 20
200
120 100 85 60 40 30 25 20
Result:
Load
F [kg]
L1 [m m]
150 200 250 400 600 800 1000 1200
x
[mm]
80
125 100 80 55 35 25 20 15
100
150 120 100 65 45 35 25 20
125
175 145 120 80 55 40 35 30
150
200 165 140 95 65 50 40 35
175
225 185 155 105 75 60 45 40
200
240 200 170 120 85 65 55 45
NOTE: load capacity used for calculation N
rec
= 1.5 kN (axial) / V
rec
= 2.2 kN (shear)
Technical assessment maximum of L1 and F (depending on load F or lever arm length L1 and X-BT-MF distance x)
FASTENING L-POST SUPPORT
WITH X-BT-MF
Two / Four X-BT-MF Threaded studs
X-BT-MF • Metric
50Issued August 2018, expiry January 2022