Installation Typicals - Fastening on Steel Threaded Studs

APPLICATION OVERVIEW HOW TO USE THIS DOCUMENT DISCLAIMERFASTENER TECHNICAL DETAILS
DOWNLOAD DRAWINGS (PDF) DOWNLOAD DRAWINGS (DWG)
Result:
L1 [inch]
F [lbs]
100 150 200 300 400 500 600 700
x
[inch]
4.0
46.00 29.75 21.75 13.50 9.50 7. 00 5.50 4.25
6.0
61.25 39.75 29.00 18.00 12.75 9.50 7. 25 5.75
8.0
76.50 49.75 36.25 22.75 16.00 12.00 9.25 7. 25
14.0
92.00 59.50 43.50 27.25 19.25 14.25 11.00 8.75
20.0
107.25 69.50 50.75 31.75 22.25 16.75 13.00 10.25
32.0
122.75 79.50 58.00 36.25 25.50 19.00 14.75 11.75
Result:
Load
F [lbs]
L1 [inch]
6.0 12.0 18.0 24.0 30.0 36.0 42.0 48.0
x
[inch]
4.0
570 334 237 183 149 126 109 96
6.0
692 422 303 237 194 164 143 126
8.0
794 500 365 287 237 201 175 155
14.0
881 570 422 334 277 237 206 183
20.0
955 634 475 379 316 271 237 210
32.0
1,019 692 524 422 353 303 266 237
Result:
Load
F [lbs]
L1 [inch]
6.0 12.0 18.0 24.0 30.0 36.0 42.0 48.0
x
[inch]
4.0
285 167 118 91 75 63 54 48
6.0
346 211 151 118 97 82 71 63
8.0
397 250 182 143 118 101 88 77
14.0
440 285 211 167 138 118 103 91
20.0
477 317 237 190 158 135 118 105
32.0
510 346 262 211 176 151 133 118
Result:
L1 [inch]
F [lbs]
100 150 200 300 400 500 600 700
x
[inch]
4.0
21.75 13.75 9.75 5.50 3.50 2.25 1.50 1.00
6.0
29.00 18.25 12.75 7. 50 4.75 3.00 2.00 1.25
8.0
36.25 22.75 16.00 9.25 6.00 4.00 2.50 1.50
14.0
43.50 27.2 5 19.25 11. 25 7.0 0 4.75 3.00 2.00
20.0
50.75 32.00 22.50 13.00 8.25 5.50 3.50 2.25
32.0
58.00 36.50 25.75 15.00 9.50 6.25 4.00 2.50
FASTENER OVERVIEWFASTENER SYSTEM
Application
Fastening of cable trays, pipes on a horizontal, braced cantilever support,
fastened on a vertical structure
Support is fastened by three / six X-BT-MR on both support and brace
baseplate with distance x
L1 is the distance of the load center to the vertical structure surface, the angle
of the brace is 4
Load F is the acceptable total load (all dead load including)
Boundary conditions
These values are ONLY reflecting capacity of X-BT-MR threaded stud.
Structural analysis of support / structure is NOT in Hilti scope. See the detailed
statements in disclaimer — 2018/05/04
Shear load fully carried by one / two top X-BT-MR (worst-case)
Load F acting at the distance of L1 from structure surface
4 studs
2 studs
1 stud
x
x
2 studs
Result:
L1 [inch]
F [lbs]
100 150 200 300 400 500 600 700
x
[inch]
4.0
18.50 14.50 12.00 10.50 9.25
6.0
27.75 21.75 18.25 15.75 14.00
8.0
37. 25 29.00 24.25 21.00 18.75
14.0
65.25 51.00 42.50 37.00 32.75
20.0
93.00 73.00 60.75 52.75 47.00
32.0
149.00 116.75 97. 50 84.50 75.25
Result:
Load
F [lbs]
L1 [inch]
6.0 12.0 18.0 24.0 30.0 36.0 42.0 48.0
x
[inch]
4.0
1,288 644 429 322
6.0
1,933 966 644 483 386 322
8.0
1,288 859 644 515 429 368 322
14.0
1,503 1,127 902 752 644 564
20.0
1,610 1,288 1,074 920 805
32.0
1,718 1,472 1,288
Result:
Load
F [lbs]
L1 [inch]
6.0 12.0 18.0 24.0 30.0 36.0 42.0 48.0
x
[inch]
4.0
644 322 215 161
6.0
966 483 322 241
8.0
644 429 322
14.0
752 564
20.0
805
32.0
Result:
L1 [inch]
F [lbs]
100 150 200 300 400 500 600 700
x
[inch]
4.0
18.50 14.50 10.50 8.50 7. 25 6.25 5.50
6.0
27.75 21.75 15.75 12.75 11.00 9.50 8.25
8.0
37. 25 29.00 21.00 17.00 14.50 12.75 11.00
14.0
65.25 51.00 37.00 29.75 25.50 22.50 19.25
20.0
93.00 73.00 52.75 42.75 36.50 32.00 27. 50
32.0
149.00 116.75 84.50 68.25 58.75 51.50 44.00
X-BT-MR • Imperial
Technical assessment maximum of F (depending on load F or lever arm length L1 and baseplate distance x)
FASTENING BRACED CANTILEVER SUPPORT
WITH X-BT-MR*
Two / Four X-BT-MR Threaded studs
*X-BT-MR is the new generation X-BT
NOTE: load capacity used for calculation N
rec
= 810 lb (axial) / V
rec
= 970 lb (shear)
72Issued August 2018, expiry January 2022