User manual

Hitachi hard disk drive specifications
33
6.4.7 Required Power-Off Sequence
The required BIOS sequence for removing power from the drive is as follows:
Step 1: Issue one of the following commands.
Standby
Standby immediate
Sleep
Note: Do not use the Flush Cache command for the power off sequence because this command does not
invoke Unload
Step 2: Wait until the Command Complete status is returned. In a typical case 350 ms are required for the
command to finish completion; however, the BIOS time out value needs to be 30 seconds considering error
recovery time.
Step 3: Terminate power to HDD.