User's Manual

STATUS
Version 2.0, February 2012. Copyright 2012 Hitron Technologies
38
Version 2.0, February 2012. Copyright 2012 Hitron Technologies
38
HITRON CGN USERS GUIDE
For each step:

Process displays when the CGN is attempting to complete a connection step.

Success displays when the CGN has completed a connection step.
2.4 THE CM STATUS SCREEN
Use this screen to discover information about:

The nature of the upstream and downstream connection between the CGN and
the device to which it is connected through the CABLE interface.

IP details of the CGN’s WAN connection.
You can also configure the CGN’s downstream center frequency.
Click Status > CM Status. The following screen displays.