Operation Manual
Built-in devices
10-2
10.2 Heating
The combined LPG heating consists of a warm air heater with
an integrated hot water boiler (capacity: 10 l).
The heating system is fully operational with or without the hot
water system.
Initial operation
• Set the air vents in the motor home so that the warm air
is blown out where required.
• Check that the chimney is clear. Remove any covers.
• Open the gas cylinder and the gas stop valve.
Operating panel
a Rotary switch for room temperature (1-5)
b green LED lights up: “ON”
green LED ashes: “COAST DOWN” to reduce the
heater’s temperature.
1
3
5
7
9
40
°
60
°
60
°
Combi
1
2
3
4
5
c
d
f
b
a
g, h
e
c Summer operation
(Water temperature 40°C or 60°C)
d Winter operation
(Heating without regulated water temperature or with
drained water system)
e Winter operation
(Heating with regulated water temperature)
f Rotary switch “OFF”
g Yellow LED lights up: “BOILER HEAT-UP PHASE”
h Red LED lights up, red LED ashes
“MALFUNCTION”: carefully clean the heater’s rotary
switch with a brush.