Operation Manual

Built-in devices
10-2
10.2 Heating
The combined LPG heating consists of a warm air heater with
an integrated hot water boiler (capacity: 10 l).
The heating system is fully operational with or without the hot
water system.
Initial operation
Set the air vents in the motor home so that the warm air
is blown out where required.
Check that the chimney is clear. Remove any covers.
Open the gas cylinder and the gas stop valve.
Operating panel
a Rotary switch for room temperature (1-5)
b green LED lights up: “ON”
green LED ashes: “COAST DOWN” to reduce the
heater’s temperature.
1
3
5
7
9
40
°
60
°
60
°
Combi
1
2
3
4
5
c
d
f
b
a
g, h
e
c Summer operation
(Water temperature 40°C or 60°C)
d Winter operation
(Heating without regulated water temperature or with
drained water system)
e Winter operation
(Heating with regulated water temperature)
f Rotary switch “OFF”
g Yellow LED lights up: “BOILER HEAT-UP PHASE”
h Red LED lights up, red LED ashes
“MALFUNCTION”: carefully clean the heater’s rotary
switch with a brush.