HODEDAH www.hodedah.com support@hodedah.
HODEDAH www.hodedah.com support@hodedah.com Breakdown Structure D B B ③ ① D A C A C D C B ④ B D A C A ② Parts ① Head Board ② Head Board 1 un. ③ Bed Back 1 un. ④ Platform 1 un. 1 un. Hardware A Bolt B Bolt C Anchor 4 un. 4 un. 1/4*90mm 1/4*50mm D Decorative ball 4 un. 4 un. E Allen Key 4 un.
HODEDAH www.hodedah.com support@hodedah.com Step 1 · Attach platform (4) to head board (1) and (2), insert the small steel plate into groove. · Insert anchor (C) into the hole on platform, thread bolt (A) through head board to attach platform. (see pictures for example) ① A ④ C HARDWARE REQUIRED ② 4*A 4*C 1*E Step 2 · Attach bed back (3) to attach head board (1) and (2), screw bolt (B) through head board to attach bed back.
HODEDAH www.hodedah.com support@hodedah.com Step 3 · Screw the decorative ball (D) on top of head board. (see pictures for example) D HARDWARE REQUIRED 4*D Step 4 · Tighten all bolts with allen key (E) after making sure they are in the right position. Job Complete ! In the interest of our environment please dispose of all packaging thoughtfully.